Salamander Broilers
MODELS
36RB 36IRB
C36RB C36IRB

ITW Food Equipment Group, LLC 3600 N. Point Blvd. Baltimore, MD 21222
F-47200 REV C. (6-21)

IMPORTANT FOR YOUR SAFETY THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL GAS EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD START-UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL. POST IN A PROMINENT LOCATION THE INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THE SMELL OF GAS IS DETECTED. THIS INFORMATION CAN BE OBTAINED FROM THE LOCAL GAS SUPPLIER.
IN THE EVENT A GAS ODOR IS DETECTED, SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE.
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE. WARNING: IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE, INJURY OR DEATH. READ THE INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT.
IN THE EVENT OF A POWER FAILURE, DO NOT ATTEMPT TO OPERATE THIS DEVICE.

SALAMANDER BROILERS
GENERAL
Salamander Broilers are produced with quality workmanship and material. Proper installation, usage, and maintenance of your broiler will result in many years of satisfactory performance.
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions provided.
Accessories are sold separately for the Salamander Broiler:



Before installing, verify that the type of gas supply (natural or propane) agrees with the specifications on the rating plate located underneath the broiler rack drip tray. If the supply and equipment requirements do not agree, do not proceed with the installation. Contact your dealer immediately.
Immediately after unpacking, check for possible shipping damage. If the broiler is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.
Before installing, verify that the type of gas (natural or propane) and the clearance dimensions (see below) agree with the specifications on the rating plate which is located under the crumb tray on the right side.
The equipment area must be kept free and clear of combustible substances.
Minimum Clearance Combustible Construction Non-Combustible Construction Rear 0” 0”
Sides (Infrared) 36IRB & C36IRB 2” 0”
Sides (Radiant) 36RB & C36RB 6” 0”
Bottom 4” with legs 0”

The installation location must allow adequate clearances for servicing and proper operation. A minimum front clearance of 24" is required.
Do not obstruct the flow of combustion and ventilation air. Adequate clearance for air openings into the combustion chamber must be provided. Make sure there is an adequate supply of air in the room to replace air taken out by the ventilating system. Do not permit fans to blow directly at the broiler. Avoid wall-type fans which create air cross currents within the room. Avoid open windows next to the broiler. Allow for maximum clearance between the flue and hood ventilation system as per NFPA 96 requirements. Minimum 18” clearance is recommended for proper operation and for compliance with local building and fire codes.
The broiler must be installed in accordance with:
In the United States of America:
In the United States of America: 1. State and local codes. 2. National Fuel Gas Code, ANSI-Z223.1/NFPA #54 (latest edition). This shall include but not be limited to: NFPA #54 Section 10.3.5.2 for Venting. Copies may be obtained from The American Gas Association Accredited Standards Committee Z223, @ 400 N. Capital St. NW, Washington, DC 20001 or the Secretary Standards Council, NFPA, 1 Batterymarch Park Quincy, MA 02169-7471 NOTE: In the Commonwealth of Massachusetts All gas appliances vented through a ventilation hood or exhaust system equipped with a damper or with a power means of exhaust shall comply with 248 CMR. 3. NFPA Standard # 96 Vapor Removal from Cooking Equipment, latest edition, available from the National Fire Protection Association, Batterymarch Park, Quincy, MA 02269.
In Canada:
Codes require that a gas shutoff valve be installed in the gas line ahead of the broiler.
NATURAL GAS: Standard orifices are set at 5" W.C. (Water Column). A pressure regulator is supplied and must be installed when the broiler is connected to the gas supply.
PROPANE GAS: Standard orifices are set at 10" W.C. (Water Column). A pressure regulator is supplied and must be installed when the broiler is connected to the gas supply.

The gas supply line must be ¾” or larger. If flexible or semi-rigid connections are used, the inside diameter must be the equivalent of ¾” iron pipe or larger. All connections of the flexible and semi-rigid type must comply with all local and national requirements. Make sure gas piping is clean and free of dirt, piping compound, and obstructions.
After piping has been checked for leaks, all piping receiving gas should be fully purged to remove air.
Gas regulator pressure is preset at 5” Water Column (W.C.) for natural gas, and 10” W.C. for propane gas. Minor adjustments may be required based on site specific gas pressure.
Install the regulator as close to the broiler on the gas supply line as possible. Make sure that the arrow on the underside of the regulator is oriented in the direction of gas flow to the broiler (Fig. 1) and the regulator is positioned with the vent plug and adjustment screw upright (Fig. 2). A recommended plumbing schematic is listed below only for Salamander units as guide to the installer and ITW Cooking Equipment or Hobart is in no way liable for plumbing installation (Fig. 3).




The minimum supply pressure (upstream of the regulator) should be 7-9” W.C. for natural gas and 11-12” W.C. for propane gas. At no time should the regulator be connected to supply pressure greater than ½ psig (3.45 kPa) or 14” W.C.
DO NOT obstruct the flow of flue gases from the flue located on the rear of the broiler. It is recommended that the flue gases be ventilated to the outside of the building through a ventilation system installed by qualified personnel.
Information on the construction and installation of ventilating hoods may be obtained from the standard for "Vapor Removal from Cooking Equipment," NFPA No. 96 (latest edition), available from the National Fire Protection Association, Batterymarch Park, Quincy, MA 02269.
Salamander Broiler Mounted on a Wall (Fig. 4).
The separate wall mounting bracket accessory (WALLMNT-CHRBKR) will be needed to wall mount the unit.

Radiant & Infrared Salamander shown on WALLMNT-CHRBKR Accessory



Fig. 5 Fig. 6

Assembly over a Gas Range (Fig. 7)
If the broiler is to be mounted over a gas range, a reinforced shelf and special mounting brackets are required.
reinforced shelf.
of the shelf.
Radiant & Infrared Salamander shown on RSHELF Accessory


Dual Zone Controls — Controls cooking areas in the left and right hand side of the cavity
allowing for flexibility and premium cooking performance.
Angled Handle — elevates or lowers the broiling grid to different positions. Grasp the
handle and pull towards broiler cavity. This releases the mechanism and allows the lifting handle to move into the desired position.
Burner Valve — regulates the flow of gas to the burners. Gas flow is increased by
turning the valve counterclockwise.
Drip Tray — Collects grease and waste which is diverted by the tilt of the drip shield.
DO NOT allow the drip tray to overflow. Empty the drip tray when three- quarters full to reduce the possibility of spillage.
Rack Handle — glides the grid forward for easy loading and unloading. To operate, pull
straight out.
Each operator will find the optimum rack position and gas setting for various products; however, it is recommended that gas input be reduced first when lower rack temperatures are desired. Further reduction in rack temperatures, if necessary, can then be obtained by lowering rack position. Infrared Models must use the full gas setting. Max and minimum temperatures can be achieved at the following settings:
2 Burners On, rack at highest position, valves set to High – 800°F
1 Burner On, rack at lowest position, valves set to Low – 250°F

rack stops.
of the way) holding tray up against racks.
care not to damage the front hooks
rack.
and wipe dry with a soft clean cloth.
or with a commercial stainless steel cleaner. Rinse thoroughly and wipe dry with a soft clean cloth.
grease and lint. DO NOT insert pick in burner port holes.
Burner valve stems must be lubricated. Upon sticking, a burner valve stem should receive maintenance from your local authorized servicer.
Pilot lights are to be kept clean and adjusted at the proper flame height.
Annually, when the broiler is cool, check the flue and clear any obstructions.
Contact your local Service Agency to obtain service and parts information.

PRINTED IN THE U.S.A.

PRINTED IN THE U.S.A.
Pages mentionnées dans ce manuel — fabricant, assistance et téléchargements.
Les utilisateurs et notre équipe répondent généralement sous 24 h — et votre question servira aussi aux suivants.
Soyez le premier à poser une question — d'autres utilisateurs ou notre équipe y répondront.