Manuel d'utilisation / d'entretien du produit Series 28A du fabricant Smith Cast Iron Boilers
Aller à la page of 28
SERIES 28A GAS OR OIL BOILER INST ALLA TION & OPERA TING INSTR UCTIONS WESTCAST , INC. 260 NORTH ELM STREET WESTFIELD, MA 01085 TEL. (413) 562-9631 F AX (413) 562-3799 DESIGNED AND TESTED A CCORDING T O A.S.M.E. BOILER AND PRESSURE VESSEL CODE, SECTION IV FOR A MAXIMUM ALLO W ABLE WORKING PRESSURE OF: 15 PSI STEAM OR 80 PSI W A TER.
Page 2 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS CONTENTS Bef ore Y ou Star t ................................................. page 2 Boiler Ratings & Capacities ................................ page 2 Boiler Location ........
Page 3 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 1- Service Clearances to Adjacent Construction W ARNING: Never install a 28A boiler on top of combustib le flooring without consulting the local building authorities f or proper installation guidelines! A minimum c learance of 6 in, 0.
Page 4 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS All Air From Inside The Building If the boiler is to be located in a confined space mini- mum clearances of 24 in , 610 mm must be maintained between the boiler and any adjacent construction.
Page 5 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Chimney Inspection & Sizing If this boiler will be connected to a masonr y chimney , a thorough inspection of the chimney m ust be perf or med. Ensure that the chimney is clean, properly constructed, lined and properly sized, see Figure 2.
Page 6 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS W ARNING: Failure to maintain minimum clearances between vent connector s and any combustib le material can result in a fire causin.
Page 7 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS c) Insof ar as is practical, close all b uilding doors and windows and all doors between the space in which the appliances remaining connected to the common v enting system are located and other spaces of the building.
Page 8 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Completed boilers must be tested as f ollo ws: Steam Boilers – the assembled boiler sections shall be subjected to a h ydrostatic test pressure of not less than 45 psig , 315 kP a .
Page 9 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS 5 . Inser t the large por t connector with its steel inner ring into the upper por t. 6 . Inser t the two round por t connectors into the lower por ts. NO TE: Appl y the spra y adhesive supplied with the boiler to the port recess to hold the por t connector in place if necessary .
Page 10 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS 9 . Assemble the rest of the sections f ollowing steps 3 through 8 abov e. 1 0 . Hydrostatically test the boiler by f ollowing the instructions on page 8. 11. While the boiler is being filled confirm that all of the draw r ods are properly tor qued and that there are no leaks.
Page 11 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 8 - Burner Mounting Plate Details Figure 9 - Observation P ort Assembly Observation P or t Assembl y , Figure 9 1 . P osition the hinged end of the steel flapper door , # 5, ov er the boss on the obser v ation por t cover , # 4.
Page 12 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Observation P or t Installation 1 . Screw the f our 5/16-18 x 1 1/2 studs into the tapped holes around the obser v ation cover opening in the back section. 2 . Place the obser vation por t cov er assembly ov er the studs and install the washers and nuts .
Page 13 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS T ankless Heater Installation - Optional 1 . Clean the heater flange to remov e any rust or debris. 2 . Install the f our 7/16" x 1 1/2" studs into the tapped holes in the tankless heater flange on the section, Figure 11.
Page 14 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS GENERAL PIPING REQUIREMENTS CA UTION: Never use automotive antifreeze in the boiler or heating system. If antifreeze is necessar y it must be f ormulated specifically f or hydronic heating systems, such as ethylene or pr opylene glycol.
Page 15 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 15 - Relief & Safel y V alve Piping W A TER BOILER PIPING The supply and retur n connections should be sized to suit the system, see Figures 13, 14, 16, 17 and T ables 5 & 6.
Page 16 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Piping For Use With Cooling Units The boiler , when used in connection with a refr igeration system, must be installed so the chilled medium is piped in parallel with the boiler .
Page 17 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 18 - T ypical Single W ater Boiler Piping Figure 19 - T ypical Multiple Water Boiler Piping.
Page 18 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS NO TE: Some locations do not allo w this solution to be used. Check with the local authority having jurisdiction. 4 . Mix the cleaning chemicals with water to create a concentrated solution.
Page 19 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Minimum F eed W ater Condensate Receiver Boiler I=B=R Gross Output Ev aporation Rate Pumping Rate Capacity Model MBH kW GPM L/hr GPM L/hr Gallons Liters 28A-S-4 900 264 1.9 7.3 3.9 14.
Page 20 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 22 - T ypical Steam Piping - Gravity Return for Multiple Boiler s Figure 23 - T ypical Steam Piping - Pumped Return for Mul.
Page 21 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Install 3" nipples and ball valv es in the two 3" NPT front section tappings so the boiler can be blo wn down. The f eed water requirements f or steam boilers at full input are shown in T able 9.
Page 22 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS W ater Boilers Fill the boiler and all of the radiation with water to the required system pressure.
Page 23 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS BOILER CHECKING & ADJUSTMENT CA UTION: Never increase the input to the boiler above that f or which it is rated. Doing so can cause premature failure of the boiler! Low Water Cutoff Ensure that the low w ater cutoff de vice(s) function(s) properly .
Page 24 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS 6 . V acuum out the bur ner base and clean and inspect all of the components. Replace any damaged or badly corroded par ts. 7 . Inspect the cleanout cov er insulation and rope seal.
Page 25 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 25 - Boiler Assembl y.
Page 26 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS 1 F ront Section 3621 111111111111111 2 Graphite P or t Connector Set 60375 3456789 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 3 Draw Rod Was.
Page 27 SERIES 28A BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS ns Rear Observation P or t Hardware 71301 1 11111111111111 Burner Mounting Plate Assembly , 9" 70641 Burner Mounting Plate As.
WESTCAST , INC. 260 NORTH ELM STREET WESTFIELD, MA 01085 TEL. (413) 562-9631 F AX (413) 562-3799 dizziness headaches nausea vision problems loss of muscle control weakness shortness of breath unclear .
Un point important après l'achat de l'appareil (ou même avant l'achat) est de lire le manuel d'utilisation. Nous devons le faire pour quelques raisons simples:
Si vous n'avez pas encore acheté Smith Cast Iron Boilers Series 28A c'est un bon moment pour vous familiariser avec les données de base sur le produit. Consulter d'abord les pages initiales du manuel d'utilisation, que vous trouverez ci-dessus. Vous devriez y trouver les données techniques les plus importants du Smith Cast Iron Boilers Series 28A - de cette manière, vous pouvez vérifier si l'équipement répond à vos besoins. Explorant les pages suivantes du manuel d'utilisation Smith Cast Iron Boilers Series 28A, vous apprendrez toutes les caractéristiques du produit et des informations sur son fonctionnement. Les informations sur le Smith Cast Iron Boilers Series 28A va certainement vous aider à prendre une décision concernant l'achat.
Dans une situation où vous avez déjà le Smith Cast Iron Boilers Series 28A, mais vous avez pas encore lu le manuel d'utilisation, vous devez le faire pour les raisons décrites ci-dessus,. Vous saurez alors si vous avez correctement utilisé les fonctions disponibles, et si vous avez commis des erreurs qui peuvent réduire la durée de vie du Smith Cast Iron Boilers Series 28A.
Cependant, l'un des rôles les plus importants pour l'utilisateur joués par les manuels d'utilisateur est d'aider à résoudre les problèmes concernant le Smith Cast Iron Boilers Series 28A. Presque toujours, vous y trouverez Troubleshooting, soit les pannes et les défaillances les plus fréquentes de l'apparei Smith Cast Iron Boilers Series 28A ainsi que les instructions sur la façon de les résoudre. Même si vous ne parvenez pas à résoudre le problème, le manuel d‘utilisation va vous montrer le chemin d'une nouvelle procédure – le contact avec le centre de service à la clientèle ou le service le plus proche.