FR
Pelco logo
Notice d'utilisation officielle

Pelco III

28 pages·1 MB·Système de sécurité domestique·PDF·ENNLJA
Pelco III
Table des matières 15 sections I N S T A L L A T I O N · Pressurized Spectra III ™ Series · Español · Português · … AfficherMasquer
Page 1 of the Pelco III user manual — Español
Page 1 · cliquer pour agrandir
Page 1

I N S T A L L A T I O N

Pressurized Spectra III ™ Series

®

Pelco III — ® diagram (page 1)
Fig. 1

Español

Português

Italiano

Français

Deutsch

Page 2 of the Pelco III user manual — I N S T A L L A T I O N
Page 2 · cliquer pour agrandir
Page 2
Page 2 of the Pelco III user manual — I N S T A L L A T I O N
Page 3 of the Pelco III user manual — English Español Português Italiano Français Deutsch
Page 3 · cliquer pour agrandir
Page 3

English Español Português Italiano Français Deutsch

ease of installation, the dome system should be assembled, pressurized, and tested before installation. A Pressurized Spectra III cable harness (supplied with the back box) is required to test and monitor the pressurized dome.

sistema. Para obtener mejores resultados y una instalación sencilla, el sistema de domo debe ensamblarse, presurizarse y probarse antes de la instalación. Se requiere un arnés de cableado del Spectra III Presurizado (suministrado con la caja posterior) a fin de probar y monitorear el domo presurizado.

Para obter melhores resultados e facilitar a instalação, o sistema de dome deve ser montado, pressurizado e testado antes da instalação. Um módulo de cabo pressurizado Spectra III (fornecido com a back box) é necessário para testar e monitorar o dome pressurizado.

ottimali e per facilitarne l'installazione, il sistema dome va montato, pressurizzato e collaudato prima dell'installazione. Al fine di collaudare e controllare il dome pressurizzato, occorre disporre di un cavo Spectra III (in dotazione al contenitore).

l'installation et obtenir les meilleurs résultats possible, assemblez, pressurisez et testez le système de dôme avant de l'installer. Un faisceau de câble série Spectra III pressurisée (fourni avec l'embase) est requis pour tester et surveiller le dôme pressurisé.

Domesystem vor der Installation zusammenzubauen, unter Überdruck zu setzen und zu testen. Zum Testen und Überprüfen des unter Überdruck gesetzten Dome wird der mit der Back-Box gelieferte Kabelsatz für das Spectra III Domesysteme mit Druckgehäuse benötigt.

Page 4 of the Pelco III user manual — B
Page 4 · cliquer pour agrandir
Page 4

Preinstallation

1 Loosen the V-band attached to the back box and let it hang to the side.

B

2 Prepare the lower dome for installation:

a. Remove the O-ring from the lower dome.

b. Lightly apply O-ring lubricant (supplied) to the O-ring.

c. Reinstall the O-ring in the groove on the trim ring.

3 Attach the back box leash to the lower dome, and let the lower dome hang to the other side of the back box.

Page 5 of the Pelco III user manual — 6 Pressurize the inside of the dome with nitrogen:
Page 5 · cliquer pour agrandir
Page 5

4 Install the dome drive:

a. Set the DIP switches located on the side of the dome drive.

Refer to the labels located on the top of the dome drive or to the Quick Start Guide shipped with the dome drive.

SW1 SW2 SW3

b. Line up the blue (A) and red (B) tabs with the blue (A) and

red (B) labels.

c. Push in on the tabs. Insert one side and then the other side.

Continue pushing until both sides of the dome drive click into place.

5 Install the lower dome:

a. Position the lower dome so that the blower duct inside the

back box is between the studs attached to the inside of the lower dome.

b. Install the V-band around the lower dome and then tighten the

fastener of the V-band.

c. Test and check the operation of the unit before pressurizing

the dome.

6 Pressurize the inside of the dome with nitrogen:

a. Remove the cap from the Schrader valve of the dome. Place

the air chuck from the charging kit over the Schrader valve of the dome system.

b. Open the tank valve of the charging kit. Fill the dome with

nitrogen for a minimum of five minutes to replace the oxygen inside the dome with nitrogen.

c. Remove the air chuck and then replace the Schrader valve cap.

d. Refer to the Operation/Programming manual for instructions

on how to view the current readings for the temperature and pressure. Record the initial temperature and pressure readings of the dome in the space provided below:

Initial Temperature Initial Pressure

Page 6 of the Pelco III user manual — Site Installation
Page 6 · cliquer pour agrandir
Page 6

Site Installation

Pelco III — Site Installation diagram (page 6)
Fig. 2 · Site Installation
Pelco III — Site Installation diagram (page 6)
Fig. 3 · Site Installation

Feed the supplied wiring harness into the front of the mount and out the back of the mount. Connect the wires as required. Refer to Tables A, B, and C for cable and wiring information. Fasten the mount to the mounting surface. Refer to the instructions supplied with the mount.

Remove the back box mounting plate: Loosen the nuts on top of the back box, and then turn the mounting plate clockwise and lift.

Pelco III — Site Installation diagram (page 6)
Fig. 4 · Site Installation
Pelco III — Site Installation diagram (page 6)
Fig. 5 · Site Installation

Thread the wiring from the mount through the mounting plate, and then attach the mounting plate to the mount. If outdoors, apply thread compound (provided) to the threads on the mounting plate.

Attach the connector of the wire harness to the mating connector located on the top of the back box. Insert the studs and nuts on top of the back box into the mounting plate, turn the back box counterclockwise, and then tighten the three nuts.

Page 7 of the Pelco III user manual — Site Installation
Page 7 · cliquer pour agrandir
Page 7

Table A. Video Coaxial Cable Requirements

Table C. Configuration of Wire Harness

Cable TypeMaximum Distance RG59/U750 ft (299 m) RG6/U1,000 ft (305 m) RG11/U1,500 ft (457 m)
PinWire ColorFunction 9-Conductor Cable ABlackAlarm 1 BRedAlarm 2 CWhiteAlarm 3 DGreenAlarm 4 EBrownAlarm 5 FOrangeAlarm 6 GYellowAlarm 7 HVioletGround –BlueNot Used 5-Conductor Cable JBlackRelay N.O. (Aux. 1) KRedRelay N.C. (Aux. 1) LGreenRelay Common (Aux. 1) MBrownGround NWhiteAuxiliary 2 Cat5 Cable PGreenTX+ RWhite/GreenTX- SBlueRX- TWhite/BlueRX- UOrangeUTP Video (+) VWhite/OrangeUTP Video (-) WBrownSpare XWhite/BrownSpare Coaxial Cable YCoaxial CoreVideo Out ZCoaxial ShieldVideo Shield Individual Wires aWhite24 VAC (AC HI) bBlack24 VAC (AC LO) cGreen/YellowEarth Ground
Minimum cable requirements75 ohms impedance All-copper center conductor All-copper braided shield with 95% braid coverage

Table B. 24 VAC Wiring Distances

Wire Gauge Total VA20 (0.5 mm2)18 (1.0 mm2)16 (1.5 mm2)16 (2.5 mm2) 7537 ft (11 m)60 ft (18 m)95 ft (29 m)153 ft (46 m)

Use a 24 VAC transformer with a minimum of 100 VA.

Poser une question sur : Pelco III

Les utilisateurs et notre équipe répondent généralement sous 24 h — et votre question servira aussi aux suivants.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
Aucune question pour l'instant sur le Pelco III

Soyez le premier à poser une question — d'autres utilisateurs ou notre équipe y répondront.

Document d'origine

Pelco III manuel PDF

28 pages·1 MB·Système de sécurité domestique·PDF
Cliquez sur une page ci-dessus pour l'ouvrir ici
Page 1 / …
100%
Chargement des pages…