Installation Manual



Tools required for Installation
Impact Wrench Electric or cordless drill Set of drill bits 1/4” to 9/16” Set of box-end wrenches 1/4” to 9/16” Set of sockets with 3/8” drive, 1/4” to 9/16” Hammer drill with 3/8” masonry bit if mounting track to concrete block wall
Items needed but not included: Screws for mounting track assembly.







GLP2003 - Glider Pulley with Bolt and Nut


Parts Identification



B-1: Left Hand Glider Stop B-2: Right Hand Glider Stop A-1: Left Hand Glider Guide A-2: Right Hand Glider Guide


D2 D1


Parts Identification Continued



Insure that Walls on each side of door
opening are clear of all obstructions
(Door will protrude 5 1/2”
Installing Door track w/ operator
Install bottom of door track 1” above door
Right hand side of door track MUST BE INSTALLED EXACTLY IN CENTER OF DOOR OPENING! center of opening


Above the left hand side of door opening install track w/ operator
As shown in Figure B
Place the bottom of track on line that
was drawn 1” above opening
as described above. Make sure track is level!
Into building) · 1” · opening Door Opening

Panel Identification:
Panel #1 Panel #2 Panel #3 Panel #4

Install all panels w/ center Brace on inside of building



Slide Panel #1 & 2 (see page 4) Into track #1 As shown in figure C and step number 6 below. Make sure center brace is on the inside of building

Slide Panel #4 (Clear Section)
Into track #2 As shown in figure D *Rubber astragal is on the right side of door panel


Into track #2 As shown in figure E *Rubber astragal is on the left side of door panel
Hang right side track ( track without Operator ) as shown in Figure F (This track will be flush with track shown in Figure E) Place the bottom of track on line that was drawn 1” above opening. Make sure track is level!!

Track #1 · Track #2




With Door Sections in Closed position:
Install Items ‘B-1,C-1, and ‘D-1’ on Panel #2 and Panel #4 as shown Install Items ‘B-2’, ‘C-2’ and ‘D-2’ on Panel #1

Panel #4 · Panel #2



**IMPORTANT - MAKE SURE DOOR IS COMPLETELY CLOSED AS SHOWN ON PAGE 4
With Door Sections in Closed position: Install item ‘A-1’ on Panel #2. The guide bar is inserted into slot of A-1 as shown
Follow same steps when installing item ‘A-2’ on Panel #1 (no picture shown) GSP: Glider Spacer for cross brace
Panel #2 · Panel #4


Keeping Door in Closed Position: Insert item ‘E-1’ onto guide bar of panel #2 and attach to wall with screws. (screws not provided)


E1
Install Item ‘E-2’ on Panel #1 as shown in step number 13 above
15 Close panels to meet in the center Preparing to install Door Brackets:

Panel #2 · Panel #4


Slide Bracket ‘A’ onto operator rod and position bracket ‘A’ 3” from edge of door as shown on step #17. Now attach aluminum block to operator rod as shown
Pre Drill holes for Brackets ‘A’ and ‘B’ Attach Bracket ‘A’ to Panel #4 and Bracket ‘B’ to Panel #3 as shown Make sure brackets are attached 3” from edge of door as shown
Position turnbuckle in center of door opening as shown above


Tighten bolts of aluminum block down onto cable.
20 Run cable around top of pulley on right side of track and through top slot of aluminum block on bracket ‘B’ (do not tighten block until later)

33” minimum 33” minimum
21 Continue running cable around bottom of pulley on left side of track. Connect cables together in center with turnbuckle.
Tighten cable by adjusting turnbuckle. Do not over-tighten. Tighten aluminum block on bracket ‘B’



Install brush on bottom of each panel so that brush angles in- ward as shown. (Brushes will angle toward each other)
Bottom of brush should touch floor for a proper seal.


J K Space Items ‘J’ & ‘K’ 2 1/4” apart Make sure center of floor guides are in center of door opening Place item ‘J’ even w/ door opening

Figure 1 Figure 2 Figure 3
Install fitting to Figure 3 and here
Install fittings to Figure 1 & 2


Install floor guides







Left side of operator (inside looking at door)
Right side of operator (inside looking at door)
Connect Air line from “A” (left side of operator) to “F” Connect Air line from “H” to “C” Connect Air line from “B” (right side of operator) to “E” Connect Air line from “G” to “D”

Connect air line from “I” to “K” Connect air line from “J” to “L”
Connect air line from compressor
Left side of Control box


To




For 10’ opening— Minimum of 33” of side room on each side Operator will open the door 9’9” wide leaving 1 1/2” of door in opening Make Floor level! Track and operator weight approx. 155 pounds. Track w/ operator extends 8 1/2” above door opening. Track is fastened to wall w/ self tapping screws 2’ apart.
33” minimum 33” minimum
Make floor level from side wall to center Of door opening. Door extends 5 1/4” into building
Les utilisateurs et notre équipe répondent généralement sous 24 h — et votre question servira aussi aux suivants.
Soyez le premier à poser une question — d'autres utilisateurs ou notre équipe y répondront.