FR
Cecilware logo
Notice d'utilisation officielle

Cecilware JAVA 2-QB-D3

15 pages·1.1 MB·Cafetière·PDF·EN
Cecilware JAVA 2-QB-D3
Table des matières 15 sections Page 3 · READY LIGHT · HEATING LIGHT · DISPENSE BUTTONS · … AfficherMasquer
Page 1 of the Cecilware JAVA 2-QB-D3 user manual
Page 1 · cliquer pour agrandir
Page 1
Cecilware JAVA 2-QB-D3 diagram (page 1)
Fig. 1
Cecilware JAVA 2-QB-D3 diagram (page 1)
Fig. 2
Page 2 of the Cecilware JAVA 2-QB-D3 user manual
Page 2 · cliquer pour agrandir
Page 2
Cecilware JAVA 2-QB-D3 diagram (page 2)
Fig. 3
Page 3 of the Cecilware JAVA 2-QB-D3 user manual
Page 3 · cliquer pour agrandir
Page 3
Cecilware JAVA 2-QB-D3 diagram (page 3)
Fig. 4
Page 4 of the Cecilware JAVA 2-QB-D3 user manual — Page 3
Page 4 · cliquer pour agrandir
Page 4

INSTALLATION Water Inlet Connection: This equipment is to be installed to comply with the applicable Federal, State, or local plumbing codes having jurisdiction. In addition: 1. A quick disconnect water connection or enough extra coiled tubing (at least 2 times the depth of the unit) so that the machine can be moved for cleaning underneath. 2. An approved back flow prevention device, such as a double check valve to be installed between the machine and the water supply. The JAVA2-QB-D is equipped with a 1/4" Flare Water Inlet Fitting, located behind the unit near the bottom. HIGHLY RECOMMENDED: A WATER SHUT-OFF VALVE and A WATER FILTER, preferably a combination Charcoal/Phosphate Filter, to remove odors and inhibit lime and scale build up in the machine. Note: In areas with extremely hard water, a water softener must be installed in order to prevent a malfunctioning of the equipment and in order not to void the warranty. STARTUP PROCEDURE Caution: Make sure that the Heater Switch, located behind unit near the bottom, is in the OFF (toggle down) position. 1. Connect the 1/4" Dia. copper waterline to the 1/4" flare water inlet fitting of the valve. 2. Connect the power cord into a proper receptacle. 3. Activate the Power Switch (Toggle Up). The tank will start filling. Allow approximately 5 minutes for the tank to fill. 4. Activate the Heater Switch. Allow approximately 20-45 minutes for the water to reach a preset temperature of 200°F. The heat up time will depend on the water inlet temperature, the input voltage, and the wattage of the elements in the machine. 5. Place cup under nozzle and press dispense switch, button will light while dispensing. The machine will dispense water at the rate of 1.3 oz. per second. Repeat it several times for each dispense switch to check for consistent output. 6. While the tank is heating up, remove the hoppers, load them with products and reposition them back in the machine. NOTE: Decanter capacity is up to 54 OZ. Cup capacity is up to 12 OZ.

Page 3

Page 5 of the Cecilware JAVA 2-QB-D3 user manual — DRINK STRENGTH ADJUSTMENT
Page 5 · cliquer pour agrandir
Page 5

PROGRAMMING FOR AUTOMATIC DISPENSE (See Door diagram) 1. Turn Power Switch ON (toggle switch inside door). 2. PRESS and HOLD [red] STOP Button with one hand. 3. PRESS and HOLD [green] DISPENSE Button with other hand. 4. RELEASE [red] STOP Button ONLY. 5. Continue to HOLD [green] DISPENSE Button until BUZZER sounds, then RELEASE. 6. PRESS and RELEASE [green] DISPENSE Button. Product begins dispensing. When it reaches the “DESIRED VOLUME”, 7. PRESS and RELEASE [green] DISPENSE Button to SET “DESIRED VOLUME”. DISPENSE Button can be jogged to top off. 8. PRESS and HOLD [red] STOP Button for 5 Secs. to LOCK IN “DESIRED VOLUME”.

READY LIGHT

HEATING LIGHT

Cecilware JAVA 2-QB-D3 — READY LIGHT diagram (page 5)
Fig. 5
Cecilware JAVA 2-QB-D3 — READY LIGHT diagram (page 5)
Fig. 6

Repeat steps 1 to 8 for each Dispense Button. The Automatic Dispense Buttons are factory programmed to dispense 1.3 oz. of water per second. NOTE: Set programming for Cup Volume with cup shelf “DOWN”. Set programming for Decanter Volume with cup shelf “UP”. PRODUCT STRENGTH ADJUSTMENTS: The JAVA 2-QBD units have variable speed control auger motors with variable speed of 10 to 30 RPM. Drink or Product Strength can be changed by adjusting the Gram Throw Dial on inside door panel. The Gram Throw is factory preset at approx. 2.2 gr. per 8 oz. cup and 15.0 gr. per decanter. The water flow rate adjustment for the dispense valve should remain fixed at 1.3 oz per sec.

DISPENSE BUTTONS

POWER SWITCH

RINSE/ SERVE SWITCH

Cecilware JAVA 2-QB-D3 — DISPENSE BUTTONS diagram (page 5)
Fig. 7

DRINK STRENGTH ADJUSTMENT

PROGRAMMI NG INSTRUCTION

Page 4

Page 6 of the Cecilware JAVA 2-QB-D3 user manual — Page 5
Page 6 · cliquer pour agrandir
Page 6

CLEANING AND SANITIZING: SANITIZING: All food dispensing units should be sanitized periodically. All parts to be sanitized must be cleaned first. To prepare a sanitizing solution: ADD 2 TSP. OF LIQUID CLOROX BLEACH (5.25% CONCENTRATION) TO 1 GALLON OF WATER AT ROOM TEMPERATURE (70°F - 90°F). Soak all parts for a minimum of 3 min. in the sanitizing solution. Note: Always start with an unopened bottle of Clorox Bleach since the solution from an opened bottle has a short life span. Let all sanitized parts drain and dry naturally. DO NOT WIPE THEM DRY. Before using the sanitized unit (or parts) with foodstuffs, rinse all parts thoroughly with water. CARE FOR STAINLESS STEEL: STAINLESS STEEL surfaces, that comes in contact with food substances, MUST BE CLEANED EVERY DAY. WHEN CLEANING STAINLESS STEEL, ONLY A PH NEUTRAL CLEANER IS TO BE USED. Use nylon or brass brushes (not steel wire brushes) for removing food deposit. Many food products contain acids, alkalis, or other substances, which corrode Stainless Steel. RECOMMENDED DAILY CLEANING AND MAINTENANCE 1. Wash cup shelf and warmer dish with dish detergent. Rinse Chambers: Flip Toggle SWITCH to RINSE position and press DISPENSE BUTTON. When done, flip toggle switch back to SERVE position. Remove and refill Hoppers. Note: When removing hoppers, turn PRODUCT GUIDE UP to reduce spillage, return to down position after re-inserting hoppers. CLEAN HOPPERS (once a week)

1. Turn the product guide up, and remove hoppers. 2. Empty out Hoppers. 3. Pull off Product Guide. 4. Wash parts with dish detergent. 5. Rinse, dry, and re-assemble parts. CLEAN DISPENSE CHAMBERS (once a week)
1. Twist CW and pull off STEAM DEFLECTOR. 2. Pull off DISPENSE CHAMBER. 3. Wash components with dish detergent. 4. Rinse, dry, and re-assemble parts.

Page 5

Page 7 of the Cecilware JAVA 2-QB-D3 user manual — Page 5
Page 7 · cliquer pour agrandir
Page 7
Cecilware JAVA 2-QB-D3 — Page 5 diagram (page 7)
Fig. 8 · Page 5
Page 8 of the Cecilware JAVA 2-QB-D3 user manual — Page 5
Page 8 · cliquer pour agrandir
Page 8
Cecilware JAVA 2-QB-D3 — Page 5 diagram (page 8)
Fig. 9 · Page 5
Cecilware JAVA 2-QB-D3 — Page 5 diagram (page 8)
Fig. 10 · Page 5
Cecilware JAVA 2-QB-D3 — Page 5 diagram (page 8)
Fig. 11 · Page 5
Cecilware JAVA 2-QB-D3 — Page 5 diagram (page 8)
Fig. 12 · Page 5
Cecilware JAVA 2-QB-D3 — Page 5 diagram (page 8)
Fig. 13 · Page 5
Cecilware JAVA 2-QB-D3 — Page 5 diagram (page 8)
Fig. 14 · Page 5
Page 9 of the Cecilware JAVA 2-QB-D3 user manual — DRAIN WATER INLET
Page 9 · cliquer pour agrandir
Page 9
Cecilware JAVA 2-QB-D3 — OVERFLOW diagram (page 9)
Fig. 15

OVERFLOW

Cecilware JAVA 2-QB-D3 — OVERFLOW diagram (page 9)
Fig. 16

DRAIN WATER INLET

Page 10 of the Cecilware JAVA 2-QB-D3 user manual — AUGER BUSHING-BACK CD279
Page 10 · cliquer pour agrandir
Page 10
Cecilware JAVA 2-QB-D3 — AUGER BUSHING-BACK CD279 diagram (page 10)
Fig. 17

AUGER BUSHING-BACK CD279

BEVELLED SOCKET CD271

NUT CD278 [2]

Cecilware JAVA 2-QB-D3 — AUGER BUSHING-BACK CD279 diagram (page 10)
Fig. 18
Page 11 of the Cecilware JAVA 2-QB-D3 user manual — AUGER BUSHING-BACK CD279
Page 11 · cliquer pour agrandir
Page 11
PARTS LIST : JAVA 2-QB-D, -D1, -D2, -D3, -DC 1 HEATER, 1500W, 120V G194A11111 1 HEATER, 3500W, 240V G197A11111 2 THERMOSTAT L681A11111 3 SILICONE GROMMET, 12 mm M461A77778 4 HI-LIMIT, 200° CUTOUT L656A11111 5 PUSH BUTTON SWITCH (GREEN DISPENSE) L455A22222 6 PUSH BUTTON SWITCH (RED STOP) L574A11111 7 PUSH BUTTON SWITCH (AMBER HOT WATER) L457A11111 8 PILOT LIGHT, GREEN (READY) 120V CH11211111 8 PILOT LIGHT, GREEN (READY) 240V CH26011111 9 RELAY, 120V B138A44443 9 RELAY, 220V (FOR 240 V UNITS) B172A44443 10 POTENTIOMETER L557A22222 11 SPEED CONTROLLER L556A22222 12 TOGGLE SWITCH, DPST (POWER ON-OFF) L299A11111 13 TOGGLE SWITCH, SPST (RINSE-SERVE) & (HEATER) L069A22222 14 PILOT LIGHT, RED (HEATING) 120V 3200411111 14 PILOT LIGHT, RED (HEATING) 240V CD55A11111 15 LATCH M705A11111 16 HOPPER CD32522222 17 WATER INLET VALVE 110V CD25711111 17 WATER INLET VALVE 220V CD25811111 18 DISPENSE VALVE L467A22223 18 240 VOLT COIL F/DISPENSE VALVE CF38A22223 19 STEAM CAP CD61A11112 20 MIXING BOWL CD13711112 21 SOCKET, MIXING BOWL CD67A11112 22 SPOUT ASSEMBLY M934Q1111_ 22 SPOUT ASSEMBLY M935Q____1 23 SPOUT ASSEMBLY M864Q____1 24 TEACH-ME TIMER DUAL L726A2_2_2 24 TEACH-ME TIMER SINGLE L576A_2_2_ 25 LEVEL CONTROL DUAL 120V L690A11111 25 LEVEL CONTROL DUAL 240V L706A11111 26 BLOWER HOSE (1" DIA) CD36911111 27 BLOWER/ FAN 120V CD56A11111 27 BLOWER/ FAN 240V CD16611111 28 TRANSFORMER, 24V CF29A22222 29 WARMER ELEMENT, 120V, 60W G386A_123_ 29 WARMER ELEMENT, 220V, 80W G110A_123_ 30 AUGER MOTOR 24V, 83 RPM CD15122222 31 PRODUCT GUIDE, LEFT CD70A11112 32 DUAL LEVEL PROBE ASSEMBLY K659Q11111 33 POWER CORD 120V C032A11111 34 POWER CORD 220V CH50A11111 34 FUNNEL V274Q____1 34 FUNNEL V270Q1111_ 35 HOPPER GUIDE SL30A22222 36 WARMER SWITCH, RED L217A_123_ 37 SHELF SWITCH 56039 1 _ 1 _ 1
Page 12 of the Cecilware JAVA 2-QB-D3 user manual — AUGER BUSHING-BACK CD279
Page 12 · cliquer pour agrandir
Page 12
Cecilware JAVA 2-QB-D3 — AUGER BUSHING-BACK CD279 diagram (page 12)
Fig. 19
Page 13 of the Cecilware JAVA 2-QB-D3 user manual — AUGER BUSHING-BACK CD279
Page 13 · cliquer pour agrandir
Page 13
Cecilware JAVA 2-QB-D3 — AUGER BUSHING-BACK CD279 diagram (page 13)
Fig. 20
Page 14 of the Cecilware JAVA 2-QB-D3 user manual — AUGER BUSHING-BACK CD279
Page 14 · cliquer pour agrandir
Page 14
Cecilware JAVA 2-QB-D3 — AUGER BUSHING-BACK CD279 diagram (page 14)
Fig. 21
Page 15 of the Cecilware JAVA 2-QB-D3 user manual — AUGER BUSHING-BACK CD279
Page 15 · cliquer pour agrandir
Page 15
Cecilware JAVA 2-QB-D3 — AUGER BUSHING-BACK CD279 diagram (page 15)
Fig. 22

Poser une question sur : Cecilware JAVA 2-QB-D3

Les utilisateurs et notre équipe répondent généralement sous 24 h — et votre question servira aussi aux suivants.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
Aucune question pour l'instant sur le Cecilware JAVA 2-QB-D3

Soyez le premier à poser une question — d'autres utilisateurs ou notre équipe y répondront.

Document d'origine

Cecilware JAVA 2-QB-D3 manuel PDF

15 pages·1.1 MB·Cafetière·PDF
Cliquez sur une page ci-dessus pour l'ouvrir ici
Page 1 / …
100%
Chargement des pages…