58MXA 4-Way Multipoise Fixed-Capacity Direct-Vent Condensing Gas Furnace Service and Maintenance Instructions → For Sizes 040—140, Series 130 NOTE: Read the entire instruction manual before performing any service or maintenance. This symbol → indicates a change since the last issue.
The ability to properly perform maintenance on this equip- ment requires certain expertise, mechanical skills, tools, and equipment. If you do not possess these, do not attempt to perform any maintenance on this equipment other than those procedures recommended in the User’s Manual.
Step 1—Cleaning and/or Replacing Air Filter The air filter arrangement may vary depending on the application or orientation. Never operate unit without a filter or with the blower access panel removed. Failure to follow this warning could result in a fire or personal injury.
11. Reinstall condensate trap and tubing if previously removed. a. Reinstall condensate trap in hole in blower shelf. b. Connect condensate trap drain tubes. See Fig. 8 or tubing diagram on main furnace door for proper tube location. (1.) Connect 1 tube (blue or blue and white striped) from collector box.
Never use matches, candles, flame, or other sources of ignition to check for gas leakage. Use a soap-and-water solution. Failure to follow this warning could result in a fire, personal injury, or death. 19. Replace main furnace door. Step 4—Cleaning Heat Exchangers The following items should be performed by a qualified service technician.
Never use matches, candles, flame, or other sources of ignition to check for gas leakage. Use a soap-and-water solution. Failure to follow this warning could result in a fire, personal injury, or death.
4. Disconnect pressure switch tubes. 5. Disconnect vent pipe from inducer housing outlet by loosen- ing coupling clamp on inducer outlet. 6. Disconnect drain tube from inducer housing. (See Fig. 8.) 7. Remove inducer housing assembly by removing 4 bolts attaching assembly to cell panel.
10. Replace main furnace door. Step 7—Electrical Controls and Wiring There may be more than 1 electrical supply to the unit. Check accessories and cooling unit for additional electrical supplies. The electrical ground and polarity for 115-v wiring must be maintained properly.
1. Leave 115-v power to furnace turned on. 2. Remove main furnace door. 3. Look into blower access panel sight glass for current LED status. NOTE: Leave blower access panel installed to maintain power to control center to view current LED status. 4. BRIEFLY remove either wire from the main limit switch until the LED goes out, then reconnect it.
NOTE: Heat tape, when used, should be wrapped around the condensate drain trap and drain line. There is no need to use heat tape within the furnace casing. Most heat tapes are temperature activated, and it is not practical to verify the actual heating of the tape.
PCB BLOWER OF F DELAY SELECTION CHART 90 SEC 135 SE C 180 SE C 225 SE C GVR HI / L O RE LA Y SEC-1 SEC-2 WHT PL1 32 1 6 5 4 9 87 LED TEST/TWIN BLOWER OFF DEL AY G R Y W C HUM H SIR ID R BL W R BLOWER SPEED SELECT FU1 COOL HEAT L2 PL3 PL2 VAC 120 L1 PR1 1 2 1 2 3 PR2 24 V A C -3A FUSE SPARE-2 SPARE-1 EAC-1 EAC-2 C 1.
→ Fig. 16—Service Label A99107 SER VICE COMP ON ENT TE ST To in iti a te th e co m po n ent test se que nc e, sh u t OF F th e r oom the rm o st at o r disconnect t he "R" t hermostat lead. Brie fly short the TEST ter minal to t he "Com 24V " ter mi nal .
Is circuit breaker closed? Close door switch and go to start. Is red LED status light on? Is door switch closed? Is red LED status light blinking rapidly without a pause? Is there 1 15v going to switch? Replace door switch. Replace control center . Replace transformer .
11 NO PREVIOUS F A UL T - Faults are erased after 48 hrs or whenever power (1 15v or 24v) is interrupted. Run system through a heating or cooling cycle to check system. 12 BLO WER ON AFTER PO WER UP (115V OR 24V) - Normal operation. Blower will run for 90 sec when furnace power is interrupted during a call for heat, R-W closed.
15.
A94328 SERVICE TRAINING Packaged Service Training programs are an excellent way to increase your knowledge of the equipment discussed in this manual, including: • Unit Familiarization.
Un point important après l'achat de l'appareil (ou même avant l'achat) est de lire le manuel d'utilisation. Nous devons le faire pour quelques raisons simples:
Si vous n'avez pas encore acheté Carrier 58MXA c'est un bon moment pour vous familiariser avec les données de base sur le produit. Consulter d'abord les pages initiales du manuel d'utilisation, que vous trouverez ci-dessus. Vous devriez y trouver les données techniques les plus importants du Carrier 58MXA - de cette manière, vous pouvez vérifier si l'équipement répond à vos besoins. Explorant les pages suivantes du manuel d'utilisation Carrier 58MXA, vous apprendrez toutes les caractéristiques du produit et des informations sur son fonctionnement. Les informations sur le Carrier 58MXA va certainement vous aider à prendre une décision concernant l'achat.
Dans une situation où vous avez déjà le Carrier 58MXA, mais vous avez pas encore lu le manuel d'utilisation, vous devez le faire pour les raisons décrites ci-dessus,. Vous saurez alors si vous avez correctement utilisé les fonctions disponibles, et si vous avez commis des erreurs qui peuvent réduire la durée de vie du Carrier 58MXA.
Cependant, l'un des rôles les plus importants pour l'utilisateur joués par les manuels d'utilisateur est d'aider à résoudre les problèmes concernant le Carrier 58MXA. Presque toujours, vous y trouverez Troubleshooting, soit les pannes et les défaillances les plus fréquentes de l'apparei Carrier 58MXA ainsi que les instructions sur la façon de les résoudre. Même si vous ne parvenez pas à résoudre le problème, le manuel d‘utilisation va vous montrer le chemin d'une nouvelle procédure – le contact avec le centre de service à la clientèle ou le service le plus proche.