FR
Aritech logo
Notice d'utilisation officielle

Aritech DIGITALK 2000

52 pages·1.3 MB·Sécurité·PDF·ENJA
Aritech DIGITALK 2000
Table des matières 23 sections English · PREFACE · Planning · Assembly · … AfficherMasquer
Page 1 of the Aritech DIGITALK 2000 user manual — Assembly
Page 1 · cliquer pour agrandir
Page 1

English

PREFACE 11

PLANNING ..................................................................................................................................... 11

ASSEMBLY.................................................................................................................................... 11

ALIGNMENT PROCEDURE .......................................................................................................... 14

PUTTING INTO OPERATION........................................................................................................ 15

CHECKING THE INSTALLATION................................................................................................. 17

PREFACE

A complete pair of devices consists of a transmitter TX and a receiver RX, each with two double parabolic mirrors. This specifically designed transmission system permits the use of up to 4 devices, beaming in one direction with no mutual interference. During operation the transmitter sends four IR beams to four parabolic mirrors on the receiver. An alarm output requires the sudden simultaneous break of all four beams.

Planning

The following features are important for planning the installation:

  • Do not exceed the recommended transmission range.
  • Requires an unimpeded direct line of vision between transmitter and receiver.
  • The range is reduced in dense fog.
  • Optimally align the transmitter and receiver.
  • Install the devices and pillars on solid surface.
  • Use a maximum of four transmitters beaming in same direction.
  • Never expose the devices to the direct effects of dirty water.
  • Never expose the receiver to direct sunlight (Indoor mode).
  • Use only shielded, twisted-paired cabling.
  • Provide sufficient number of core leads and sufficient cable thickness.
  • Heating elements are required for outdoor use.
  • Note double exposure by mixed installation with other systems (DIGITALK is also Master and Slave) !

Examples for Planning: Please, request on Warning Planning Instructions.

Assembly

Alarm An alarm is set off when all four beams are completely interrupted.

First alarm memory It identifies the specific detector and records any alarms occuring during the current disarmed period.

Self- diagnostic test DQ The device can detect when the IR beam intensity at the receiver is reduced, due to for example dense fog, snow, a dirty lens or mechanical problems. The beam is then ignored in order to avoid signalling a false alarm. The time interval to trigger this can be adjusted to 5, 10, 15 or 30 seconds. During this time the receiving amplitude must be below a defined level. If this level is exceeded, even temporarily, the time restarts.

Technical Alarm There is a technical alarm when an error occurs in the data processing device or it fails due to external distrurbances.

Page 2 of the Aritech DIGITALK 2000 user manual — Installation of the single units
Page 2 · cliquer pour agrandir
Page 2

Armed/disarmed In the armed position, the system is „ready for operation“. This means that all indicators are switched to dark and a break in the IR beam will cause an alarm output, setting the first alarm memory. When disarmed, the first alarm memory is blocked. Walk test It serves the system’s remote test via a central control device. An active walk test switches off the transmitter and an alarm is then detected at the receiver.

Sabotage A sabotage alarm output is linked through a potential-free switch contact. This is only available for single units (in case of pillar-mounted devices, it is linked to the cover contact which will be installed inside the pillars).

Indication of Crossillumination ( Disqualification & Technical alarm are parallel )

A crossillumination through an foreign transmitter, used for surmounting or direct sunlight, indicate a Crossillumination. In case of this indication will be both outputs activated, disqualification and technical alarm, but if the IR beam is missing on the receiver, they suppress the alarm. Foreign disruptive actions activate the indication of crossillumination and eliminate the false alarm’s.

The assembly procedure is as follows:

  • Before the installation of pillars, first prepare the base covers and pillars.
  • Provide base covers for the concrete foundation.
  • Wall-mounted devices need to be fastened by drilling.
  • For outdoor use, install heating elements into the pillars.
  • Install the devices at the correct height.
  • Wire the transmitter and receiver.
  • Align the transmitter and receiver optimally.
  • Adjust the system parameters.
  • Check that the system is functioning correctly.

Each pair of devices must be arranged so that the beam runs between transmitter and receiver without being interupted by growing bushes, shrubs, or other objects (whose height should be kept below a certain level.

Installation of the single units

Aritech DIGITALK 2000 — Installation of the single units diagram (page 2)
Fig. 1 · Installation of the single units

To open the device, carefully release the housing cover locking. Two plastic holders on the top and bottom of the base are used to fix the devices. The cable entry hole is located on the left side of the base. When finished installing and wiring, carefully replace the cover and secure it by means of the blocking clamps.

The devices must be mounted vertically on a solid surface using the plastic footpads to provide sufficient ventilation and isolation. For wall-mounted devices, use the base as a template for marking the screw hole locations. The mounting surface must be free from vibration.

Page 3 of the Aritech DIGITALK 2000 user manual — Installing heating elements
Page 3 · cliquer pour agrandir
Page 3

Mounting the pillars

Concrete foundation

To prevent the ground plates (➨A) from moving due to weather, they must be firmly fixed on a flat concrete foundation. The position of the cable on the ground plate must be taken into account.

The minimum size of the concrete foundation (➨C) is depending on the pillars height. For pillars up to 2m high, the foundation area must be at least 60 x 60 cm. When they exceed 2 m, the foundation area should be 80 x 80 cm. Fix the ground plate on the concrete foundation either by using four 4 heavy-duty bolts (for pillar height up to 2 m, length 140 mm, M16) or by 2 concrete anchors (➨B) (for pillar height over 2m, depth at least 350 mm, diameter 16 mm).

Installing the pillars

Pre-drill holes in the pillars, aligned with the ground plate holes. The maximum height of the pillar must be considered (max. length 1.5 m or 3.0 m, depending on the ground plate).

For wall mounting, leave approx. 4 mm at the mounting side for the cover. If the pillars are to be installed inside of a building a ground plate can be also used instead of a cover, so no minimum distance is required.

A tamper switch can be used to further secure the top and bottom covers. This must be installed and locked at the upper and / or lower end of the pillar. When installing the covers, the switch must be activated.

Installing the devices in the pillars

The transmitters and receivers are inserted into the pillars at desired height and fastened by screws. Before installing the devices, confirm where the cables will pass in the pillars. The installation is made easier as the devices and pillars have already been assembled, wired and tested in the labority. Consequently, only the underground cable needs to be connected on site.

Installing heating elements

When used outside, the devices and pillars must be equipped with heaters in order to prevent condensation on the optical devices.

As shown on the illustration, the heating elements are inserted into the board (➨8) at the base of the devices.

Pillars should be equipped with at least one panel heating element per meter of pillar above ground level. The panel heating elements are inserted in the pillars and securedat the correct mounting height. Heaters can use either AC or DC. If running by AC, an ordinary transformer can be used.

Page 4 of the Aritech DIGITALK 2000 user manual — Range of adjustment
Page 4 · cliquer pour agrandir
Page 4

Connections

Aritech DIGITALK 2000 — Connections diagram (page 4)
Fig. 2 · Connections

+/ operational voltage -/ operational voltage tamper (only for single units) tamper (only for single units) vacant for terminal resistance

+/ operational voltage -/ operational voltage tamper (only for single units) tamper (only for single units) vacant for terminal resistance go test technical alarm COM Sync Sync-COM technical alarm

NO COM vacant for terminal resistance disqualification first alarm memory technical alarm armed/disarmed COM

Synchronising the transmitters

It is only necessary to synchronise transmitters when more than one transmitter is beaming in the same direction. For this purpose both clamps 9 - Sync and clamps 10 - Sync-COM must be connected together to the transmitter (see wiring examples).

A maximum of four transmitters can be synchronised together, each set to a different channel. The transmitters will synchronise by themselves after powering up.

Alignment procedure

Step-by-step instructions for aligningthe mirrors:

1. Loosen locking screw on the mirror holder until the mirrors can be adjusted by hand. 2. Point the mirror as accurately as possible towards its corresponding mirror on the opposite pillar. Over large distances, use the periscope. A flashlight can be used to help locate the opposite pillar. 3. Tighten the locking screw of the mirror until it is no longer possible to adjust it by hand. 4. Set the MO adjustment switches on both devices to the corresponding position of the mirror. 5. Adjust the mirror on both devices with the key until as many LED’s as possibleare lit. 6. Repeat steps 1 to 5 for the second set of mirrors.

Range of adjustment

The parabolic mirrors can be adjusted horizontally by approx. ±90° and vertically approx. ±15°. Consequently, the devices do not have to point in just one direction. A spanner has been included to make fine adjustments.

Page 5 of the Aritech DIGITALK 2000 user manual — Putting into operation
Page 5 · cliquer pour agrandir
Page 5

Mechanical alignment by using a periscope

Insert the periscope support into the top pair of mirrors of the transmitter and, looking through the periscope, carefully position the mirror so that you can see in its center the corresponding mirror on the opposite pillar. Repeat for the other mirrors of the transmitter and receiver. If there is a large distance between the transmitter and receiver, use a searchlight to improve.

Electro-optical alignment

Align the parabolic mirrors of the transmitters until the LED lights on the receiver panel light up. This also applies to the LED lights of the radio controoled module, which is optional. The alignment of both mirrors (top and bottom) must be carried out separately. However, the operating module switch MO of the transmitter and receiver mirrors must be aligned at the same time. Note that corresponding mirrors must be adjusted for both transmitter and receiver.

Aritech DIGITALK 2000 — Electro-optical alignment diagram (page 5)
Fig. 3 · Electro-optical alignment

LED receiver (alignment mode) 7 alarm (no IR-connection) 6 5 alignment signal 4 The more LEDs are lighting up the better 3 the distance has been adjusted 2 1

Putting into operation

Adjustments at the transmitter

Aritech DIGITALK 2000 — Putting into operation diagram (page 5)
Fig. 4 · Putting into operation

channel CH (➨9) mode MO(➨8)

coding jumper coding jumper jumper removed GND (➨3) connecting clamp 2-GND is connected with housing

connecting clamp 2- is not connected with housing Power (➨5) transmission power high for greater distances

Page 6 of the Aritech DIGITALK 2000 user manual — Functioning of the LED‘s
Page 6 · cliquer pour agrandir
Page 6

Adjustments at the receiver

Aritech DIGITALK 2000 — Adjustments at the receiver diagram (page 6)
Fig. 5 · Adjustments at the receiver

channel CH (➨9) disqualification DQ (➨10) Mode MO (➨11)

1 2 channel 1 5 sec. Alignment upper parabolic mirror

1 2 channel 2 10 sec. Operating mode indoor Alarm output at disqualification

1 2 channel 3 15 sec. Alignment parabolic mirror below

1 2 channel 4 30 sec. Operating mode outdoor Without alarm, if only disqualification Indication of crossillumination active

coding jumper coding jumper Coding jumper removed GND (➨3) connecting clamp 2 GND is connected with housing

Connecting clamp 2 GND is not connected with housing

alarm response sensibility 50-300ms (➨12) The alarm response sensitivity is the period during which the IR beam needs to be interrupted before an alarm is activated.

running - 50ms walking - 150ms slow walking - 300ms

Functioning of the LED‘s

The operation of the LED indicator depends on the adjusted mode. In the alignment mode, the receiver LED’s show the alignment signal (see Alignment). In the operating mode, the state of the system is shown in the following table. When a system is armed, all lights on the receiver are unlit.

Aritech DIGITALK 2000 — Functioning of the LED‘s diagram (page 6)
Fig. 6 · Functioning of the LED‘s

LED Transmitter receiver 7 functioning-LED (alignment) (➨8) alarm is active (➨14) 6 – first alarm memory is active (➨15) 5 – disqualification is active (➨16) 4 – functioning LED (➨17) 3 – – 2 – – 1 – –

fast slow

Page 7 of the Aritech DIGITALK 2000 user manual — Operational test
Page 7 · cliquer pour agrandir
Page 7

Checking the installation

Checklist

1. Is the beam unobstructed between the transmitter and receiver 2. Are the same channels adjusted with transmitters and receivers belonging together? 3. Are the individual parabolic mirrors aligned to optimum? 4. Are the screws at the mirror holders tightened enough? 5. Are all cable clamps tightened strong enough? 6. Are transmitter and receiver switched into operating mode? 7. Are there heating elements installed for outdoor application? 8. Has the operating voltage at transmitter and receiver (12-24 V) been checked ? 9. Has the operating voltage at devices and pillar’s heaters (12, 24, or 48 V) been checked?

Operational test

1. Check the alignment by using the enclosed cardboard cut-outs („Shadow paper“): when the whole of the cut-out is positioned in the middle of the mirror, the receiving signal shouild still be at maximum. If not, readjust the beam. 2. Disconnect the upper mirror of the receiver → no alarm should be activated. 3. Disconnect the lower mirror at the receiver → no alarm should be activated. 4. Disconnect the upper and lower mirrors → an alarm should be activated, the top LED (alarm) on the receiver lights up.

Poser une question sur : Aritech DIGITALK 2000

Les utilisateurs et notre équipe répondent généralement sous 24 h — et votre question servira aussi aux suivants.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
Aucune question pour l'instant sur le Aritech DIGITALK 2000

Soyez le premier à poser une question — d'autres utilisateurs ou notre équipe y répondront.

Document d'origine

Aritech DIGITALK 2000 manuel PDF

52 pages·1.3 MB·Sécurité·PDF
Cliquez sur une page ci-dessus pour l'ouvrir ici
Page 1 / …
100%
Chargement des pages…