Manuel d'utilisation / d'entretien du produit 3400 du fabricant YORKVILLE
Aller à la page of 25
SERVICE MANUAL 3 4 00 HIGH EFFICIENCY STEREO POWER AMPLIFIER U.S.A. Yorkville Sound Inc. 4625 Witmer Industrial Estate Niagara Falls, New York 14305 USA Voice: (716) 297-2920 Fax: (716) 297-3689 WORLD.
1 AUDIOPRO AP-3400 SERVICE MANUA L M1012A “THE INPUT BOARD” The input board processes the audio signal from the input jacks to the voltage a mplifier board, (M1011A). Each channel consists of a ba lanced gain stage, defeatable b ass boost filter, and a preemphasis filter network.
2 VOLTAGE AMPLIFIER: The voltage ampl ifier amplifies the audio signal?s voltage fro m 4.8 volts peak ( at the output of U2) to approximen tly 97v peak which is required to dr ive the current amplifier boar d M1002A. M1 002A provides t he current req uired for the 97v peak signal t o drive 1200 w atts into 4 ohms ou t of the binding posts.
4 5 QUIESCENT CONDITION: This design is class A/B and t herefore the outpu t driver transis tors must be for ward biased to pr ovide low cross over distortion. In mos t class A/B des igns, a diode ch ain or VBE mult iplier is us ed to control the bias voltage and provide a means of adjust ing the bias.
6 The voltage betwee n the amplifier?s out put and test point 4 is approximate ly 14.7VDC derived from the v oltage drop across ZD3 @ ZD4. We ca ll this voltage the “float ing battery” because it floats on top of the output audio signal with poi nt 4 always being 1 4.
8 EMS Circuit The Energy Mana gement System c ircuit only applies to North American lin e voltage pro ducts. A North Am erican AC receptacle can pr ovide 1850 w atts before the wal l breaker would tri.
10 STEP 3: POWER UP PROCE DURE WITHOUT M1002A BOARDS It is extremely important that y ou never power u p an AP3400 wit h the interconnec ting cablesb etween the circu it boards not connec ted. Time and possible further damage wi ll be reduced if you test M1011 A and M1002A boards separat ely.
Identifying Defective Boards in the AP-3000 & AP-3400 Please note: All boards used in the AP-3400 are designated with an `A' suffix (e.g. M1002A) and use bright red solder mask STEP 1: VISUAL INSPECTION OF FRONT PANEL AND FAN a) Check to see whether the green power LED is lit.
220R0 R51 6800u 80V C22 6800u 80V C23 T5 T3 T1 T4 6800u 80V C24 6800u 80V C25 T10 T9 T8 T7 T6 T2 249R:1% R5 BC550 Q1 BC550 Q4 BC560 Q2 BC560 Q3 2R2 R3 2R2 R4 150R R7 150R R15 4K7 R10 CW 4K7 LIN RT1 1n.
820R R9 RED LD1 47p C2 47p C1 10K:1% R14 10K:1% R13 1/2 33078 U2 2 3 1 1u 16v C3 100K RV2 D2 D1 100K RV1 1K R2 BC550 Q3 330R R36 MS4 1 2 3 4 5 6 7 8 1/2 33078 U3 2 3 1 BF872 Q11 220K R10 100n C4 2u2 1.
SHEAR SHEAR ROUTE GAGE 0.01"/HOLE .020" .012" .008" .005" VCD .020" .012" .008" .005" SHEAR SHEAR .020" .
TJH1 GUIDE ETCH EY16 F HS1 PART# HS2 PART# R60B 2_WATT 220K @R8 J1 J9 HS3 PART# D21B 4148 D21A 4148 1 _MW1 FUNCTION PART# Q19B MJE350 TP6 TP5 C22B @C1 300V 10P C23B @C1 300V 10P C22A @C1 300V 10P C23A @C1 300V 10P Q19A MJE350 Q18A MJE340 Q18B MJE340 C27B @C2 160V 10U C28B @C2 160V 10U C28A @C2 160V 10U C27A @C2 160V 10U R103 @R3 0.
1/2 5532 U3 2 3 1 4M7 R14 16v 470n C7 OUT IN S1 1 2 3 1/2 5532 U3 6 5 7 17K8:1% R15 16v 150n C9 16v 47n C8 16v 100n C6 16v 68n C5 SRT CH_B_IN NO_GOLD JB2 1 2 3 4 5 6 NUTRIX BAL_IN JB1 1 3 2 1/2 33078 .
VCD .025" .030" .040" .050" .060" SHEAR SHEAR SHEAR SHEAR SHEAR 2.00 2.00 SOLDERSIDE M1012-2.00 1.20 SEPT’89 M1012 M1012 M1012 BLANK SIZE=15.
WC3 MC1 1 40CFM FAN 22n CSA C54 MC1 2 D47 7K5 R123 33v 500mW ZD15 27K R116 8 7 MC1 3 MC1 4 MC1 5 WC8 WC6 WC4 WC7 EY7 EY6 EY3 EY5 EY10 WC11 WC1 1K R124 D48 EY13 EY14 D37 D46 22n CSA C53 4n7 CSA C55 EY4 EY2 EY11 D41 4v7 500mW ZD10 2R2 0.
WC3 MC1 1 40CFM FAN 22n CSA C54 MC1 2 D47 7K5 R123 33v 500mW ZD15 27K R116 8 7 MC1 3 MC1 4 MC1 5 WC8 WC6 WC4 WC7 EY7 EY6 EY3 EY5 EY10 WC11 WC1 1K R124 D48 EY13 EY14 D37 D46 22n CSA C53 4n7 CSA C55 EY4.
.020" .012" .008" .005" SHEAR SHEAR SHEAR SHEAR SHEAR SHEAR SHEAR SHEAR VCD .020" .012" .008" .005" .020" .012" .008" .005" SOLDERSIDE M1013-2.30 2.30 BLANK SIZE=12.600"X6.500" M1013- 2 OZ COPPER DRILL DETL M1013-2.
R27 2R2 GS Q6A @Q1 MTP2P50E D1 4148 D2 4148 D3 4148 J12 R79 1W 0.R47 D9 4148 C22 @C3 #5892 80V 6800U C23 @C3 #5892 80V 6800U C24 @C3 #5892 80V 6800U C25 @C3 #5892 80V 6800U C3 22U 10V TAB7 WC6 WC6 16AWG 5.
T esting Repaired Circuit Board Now th at you have rebui lt the M1 002 or M1002A circuit board . It is jus t as impo rtant t o properly pow er up the boar d. If the si newave d oesn’ t look r ight ch eck the s ignal a t test point (1 ) on M1 002 t o ensure that the volt age amplif ier on bo ard M1011 or M1011 A is n’t distor ting the si gnal.
YORKV ILLE SOUND AP3000 AND AP3400 SERVICE Quick Fix for M1002 and M1002A To speed up the servicing of the AP3000 or AP3400 on your bench, Yorkville Sound’s service department has d eveloped a method to replace the components most likely to fail when a M1002/A amplifier board requir es service.
STEP 1. Locate the assem bly drawing for the vers ion num ber pr inted o n the M1002 or M1002A circui t board to be se rviced. 2. Rem ove all of t he transi stor s coloure d RED on t he assem b ly draw ing. 3. Measure a nd rem ove any of the di odes col oured BLU E on the assem bly drawin g tha t m ay be d am aged.
5. Measure the resistor coloured GREEN. Th e measured value should measure within + or – 5% valu e listed in the t able below. Replace any resi stor t hat measure d bey ond th e + or – 5% value list ed in the ta ble bel ow . Resistor P rinted Correct Number Value Measured Value -5% +5% R10 4K7 2K25 2K3 2K35 6.
SHEAR SHEAR SHEAR SHEAR VCD SHEAR SHEAR SHEAR SHEAR SOLDERSIDE M1002-9.00 BLANK SIZE=14.750"X8.850" S GG S G S D G S D G G S R27 2R2 GS Q6A @Q1 MTP2P50E D1 4148 D2 4148 D3 4148 J12 R79 1W 0.R47 D9 4148 C22 @C3 #5892 80V 6800U C23 @C3 #5892 80V 6800U C24 @C3 #5892 80V 6800U C25 @C3 #5892 80V 6800U C3 22U 10V TAB7 WC6 WC6 16AWG 5.
BL U RED BL U GR E Y Y ELLOW WH I TE YEL WHT RED FAN- BL K T-BRK BL K RED Y ELLOW BLU AC- W HI TE FAN- L1 WC 7 C44 C45 C46 C47 EY7 EY10 EY11 EY5 EY 1 2 WC8 TJ H 1 WC10 WC 4 WC3 EY13 WC 1 WC11 WC6 EY8 EY6 EY9 RV5 100K EY2 EY3 EY4 C55 4N7 250V EY14 C53 22N 250V C54 22N 250V RV6 100K #1 289 AP-3400C E XFM R WIRING NOV 13.
BL U RED BL U GR E Y Y ELLOW WH I TE YEL WHT RED FAN- BL K T-BRK BL K RED Y ELLOW BLU AC- W HI TE FAN- L1 WC 7 C44 C45 C46 C47 EY7 EY10 EY11 EY5 EY 1 2 WC8 TJ H 1 WC10 WC 4 WC3 EY13 WC 1 WC11 WC6 EY8 EY6 EY9 RV5 100K EY2 EY3 EY4 C55 4N7 250V EY14 C53 22N 250V C54 22N 250V RV6 100K #1 289 AP-3400C E XFM R WIRING NOV 13.
Un point important après l'achat de l'appareil (ou même avant l'achat) est de lire le manuel d'utilisation. Nous devons le faire pour quelques raisons simples:
Si vous n'avez pas encore acheté YORKVILLE 3400 c'est un bon moment pour vous familiariser avec les données de base sur le produit. Consulter d'abord les pages initiales du manuel d'utilisation, que vous trouverez ci-dessus. Vous devriez y trouver les données techniques les plus importants du YORKVILLE 3400 - de cette manière, vous pouvez vérifier si l'équipement répond à vos besoins. Explorant les pages suivantes du manuel d'utilisation YORKVILLE 3400, vous apprendrez toutes les caractéristiques du produit et des informations sur son fonctionnement. Les informations sur le YORKVILLE 3400 va certainement vous aider à prendre une décision concernant l'achat.
Dans une situation où vous avez déjà le YORKVILLE 3400, mais vous avez pas encore lu le manuel d'utilisation, vous devez le faire pour les raisons décrites ci-dessus,. Vous saurez alors si vous avez correctement utilisé les fonctions disponibles, et si vous avez commis des erreurs qui peuvent réduire la durée de vie du YORKVILLE 3400.
Cependant, l'un des rôles les plus importants pour l'utilisateur joués par les manuels d'utilisateur est d'aider à résoudre les problèmes concernant le YORKVILLE 3400. Presque toujours, vous y trouverez Troubleshooting, soit les pannes et les défaillances les plus fréquentes de l'apparei YORKVILLE 3400 ainsi que les instructions sur la façon de les résoudre. Même si vous ne parvenez pas à résoudre le problème, le manuel d‘utilisation va vous montrer le chemin d'une nouvelle procédure – le contact avec le centre de service à la clientèle ou le service le plus proche.