
“If you have questions, call 800.GE.CARES or visit our website at: ge.com”
MATERIALS YOU WILL NEED
Read these instructions completely and carefully.
Wire Nuts Junction Box (Sized for conduit per local electrical
90º or Straight Squeeze Connector
codes.)
1/8″ Drill Bit & Electric or Hand Drill
1/4″ Nut Driver
Baffle (For all installations except over an oven.)
2 Hold-Down Brackets 6 Hex-Head Screws 2 Thumbscrews

ELECTRICAL REQUIREMENTS
This appliance must be supplied with the proper voltage and frequency, and connected to an individual, properly grounded branch circuit, protected by a circuit breaker or a time delay fuse as noted on name plate.
We recommend you have the electrical wiring and hookup of your cooktop connected by a qualified electrician. After installation, have the electrician show you where your main cooktop disconnect is located.
Wiring must conform to National Electrical Code and all local electrical codes. You can get a copy of the National Electrical Code, ANSI/NFPA No. 70-Latest Edition, by writing:
National Fire Protection Association
Batterymarch Park Quincy, MA 02269
In Canada, wiring must conform to Canadian Electrical Code (CEC).
The cooktop conduit wiring is approved for copper wire connection only, and if you have aluminum house wiring, you must use special UL approved connectors for joining copper to aluminum. In Canada, you must use special CSA approved connectors for joining copper to aluminum.
You must use a two-wire, three conductor 208/240 VAC, 60 Hertz electrical system. A white (neutral) wire is not needed for this unit.
Refer to the name plate on your cooktop for the KW rating for your cooktop.
These cooktops require 50 amp service.
Name plate location

ADVANCE PLANNING
These cooktops may be installed in combination with an approved downdraft vent or a single oven.
Cooktop and a Downdraft Vent
– The countertop must have a deep flat surface
When preparing cooktop opening, make sure the inside of the cabinet and the cooktop do not interfere with each other. (See section on preparing the opening.)
to accommodate the combined installation of the cooktop and vent.
– Consideration must be given to the separate
electrical supply locations.
Remove packaging materials and literature package from the cooktop before beginning installation.
– Allow 12″ clearance between the inlet air ports
on the cooktop bottom toward the rear to any obstruction.
– Both the cooktop and the vent must be installed
according to each specific product installation instruction.
Cooktop with a Single Oven
– Consideration must be given to the separate
electrical requirements and locations.
Remove Installation Instructions from the literature pack and read them carefully before you begin.
– Both the cooktop and the oven must be installed
according to each specific product installation instruction.
Be sure to place all literature, Owner’s Manual, Installations, etc. in a safe place for future reference.
Installation Above Cabinet Drawers
Allow 12″ clearance to combustibles below the cooktop. A drawer directly below the cooktop cannot be used to store items such as towels or paper products. Use a false drawer front to obtain clearance if necessary.
Before you begin-Read these instructions completely and carefully. IMPORTANT- Save these instructions for local inspector's use. IMPORTANT- OBSERVE ALL GOVERNING CODES AND ORDIANCES. Note to Installer- Be sure to leave these instructions with the consumer. OWNER- Keep these instructions for future reference. Note- This appliance must be properly grounded (if applicable).
Before you begin-Read these instructions completely and carefully. IMPORTANT- Save these instructions for local inspector's use. IMPORTANT- OBSERVE ALL GOVERNING CODES AND ORDIANCES. Note to Installer- Be sure to leave these instructions with the consumer. OWNER- Keep these instructions for future reference. Note- This appliance must be properly grounded (if applicable).
Make sure you have all the tools and materials you need before starting the installation of the cooktop.
Your home must provide the adequate electrical service needed to safely and properly use your cooktop. (Refer to section on electrical requirements.)
When installing your cooktop in your home, make sure all local codes and ordinances are followed exactly as stated.
Make sure the wall coverings, countertop and cabinets around the cooktop can withstand heat (up to 200°F) generated by the cooktop.
Combination Installations

VERTICAL CLEARANCES (CONT.)
IMPORTANT: To ensure long life of the electronic components, allow a minimum of 12″ free space for air circulation below the cooktop bottom. (Except installation over a single oven.) The cooktop bottom has air intake ports toward the front that help cool the components. Do not install a shelf or partition beneath the cooktop that is more than 18″ deep.
13″ MAX. Depth of uprotected overhead cabinets
2″ MIN. Clearance from cutout to side wall on the right of the unit
30″ MIN. Clearance from countertop to unprotected overhead surface
15″ MIN. Height from countertop to nearest cabinet on either side of unit
CUTOUT DIMENSIONS OF THE COUNTERTOP To insure accuracy, it is best to make a template when cutting the opening in the counter.
2″ MIN. Clearance from cutout to side wall on the left of the unit
If a 30″ clearance between the cooking surface and overhead combustible materials or metal cabinets cannot be maintained, a minimum clearance of 24″ is required and the underside of the cabinets above the cooktop must be protected with not less than 1/4″ insulating millboard covered with sheet metal not less than 0.0122″ thick.
19-1/8″ depth of cutout
33-7/8″ width of
cutout 1-3/4″ Min. Between cutout and the wall behind the cooktop
2-1/2″ Min. from front edge
Use a 36” or wider cabinet base.
36″ (36-1/8″ SS) at center
20-7/8″ (21″ SS) at center
4-5/8“ at front baffle
Make sure the wall coverings, countertop and cabinets around the cooktop can withstand heat (up to 200°F) generated by the cooktop.
3-1/4” at rear air intake
Wall coverings, cabinets and countertop must withstand heat up to 200°F.
Allow 12” minimum vertical clearance between the cooktop bottom and any combustible surfaces.
12″ Min. Vertical Clearance
18″ Max. Deep Shelf

COOKTOP REQUIREMENTS
The countertop must have a deep flat surface to accommodate the cooktop and vent. Countertops with a rolled front edge and backsplash will not provide the flat surface area required.
The installation of the downdraft vent with this cooktop requires careful consideration. Both the cooktop and the vent must be installed according to each specific installation instruction.
– All cutout clearances for this installation must
be observed.
1-3/4" Min. Cooktop Cutout to Rear Vertical Combustible Surface
34" Cooktop and Vent Cutout
23" (SS) 22-7/8" (B,W) Total Flat
2-1/2" Min. Clearance to Cutout Front Edge of Countertop
2" Min. Cutout to Side Walls
2-1/2" to Cutout 1-7/8"
The combined installation will fit in a standard 24″ deep base cabinet. Use a 36″ or wider base cabinet.
3/4" Thick Support Rail
– The vent housing, blower and ductwork will
occupy the base cabinet.
22-3/4" Inside 22" to Support Rail

POWER SUPPLY
The oven requires a separate, properly grounded 20 Amp, 3-wire 208 or 240 volt, 60 Hz power supply. The cooktop requires a separate 50 Amp, 3-wire, 208 or 240 volt, 60 Hz power supply.
These cooktops may be installed over a single oven. Both the cooktop and the oven must be installed according to each specific installation instruction.
– Allow 4″ Min. clearance from the top of the
countertop to the top of the oven cutout.
1-1/2″ cabinet top
19-1/8″ 2-1/2″ min.
4″ min. 36″ countertop
height 27-1/4″ min. 27-5/16″ max. 28-1/2″ min. 28-5/8″ max.
23-1/2″ min.
3/4″ support platform required
Must match toekick height
Must support 200 lbs.
Use a 36″ or wider base cabinet.
25″ · 33-7/8″

THREE-CONDUCTOR BRANCH CIRCUIT CONNECTION
When connecting to a three-conductor branch circuit, if local codes permit:
a. Connect the bare cooktop ground conductor
with the crimped ground (green) lead to the branch circuit ground (green) using a wire nut.
16″ Min.
Ground and Neutral Wires
so that it can be reached through
the front of the
cabinet.
b. Connect the cooktop red lead to the branch
circuit red lead in accordance with local codes, using a wire nut.
c. Connect the cooktop black lead to the
branch circuit black lead in accordance with local codes, using a wire nut. If the residence red, black or white leads are aluminum conductors, see WARNING.
d. Install Junction Box Cover.
bare copper) in accordance with local codes. If the residence grounding conductor is aluminum, see WARNING.


PROTECT SURFACE OF COOKTOP Place a towel or tablecloth onto the countertop. Lay the cooktop upside down onto the protected surface.
1 ATTACH FOAM TAPE Apply the foam tape around the outer edge of the glass. Do not overlap the foam tape.


4 INSTALL BAFFLE Secure the baffle to the cooktop with screws.
INSTALL HOLD-DOWN BRACKETS Start one screw through the bracket and into the cooktop. (Both sides.) Do not tighten. Turn the bracket inwards to avoid interference when dropping the cooktop into the countertop.


INSERT COOKTOP INTO CUTOUT Insert the cooktop centered into the cutout opening. Make sure the front edge of the countertop is parallel to the cooktop. Make final check that all required clearances are met.
ATTACH HOLD-DOWN BRACKETS TO CABINET Open the cabinet door. Install the second screw through the bracket and tighten. Then tighten the first screw. Install thumbscrew until it touches the bottom of the countertop.

OPERATION CHECKLIST
Remove all protective film, if present, and any stickers.
Remove all items from the top of the cooktop surface.
A
Check to be sure that all wiring is secure and not pinched or in contact with moving parts.
Turn on the power to the cooktop. (Refer to your Owner’s Manual.) Verify that all surface burners operate properly.
B
Check level of appliance.
Check that the circuit breaker is not tripped nor the house fuse blown.
Check that the cooktop is properly grounded. D
Check that conduit is securely connected to the junction box.
See Owner’s Manual for troubleshooting list.
NOTE TO ELECTRICIAN: The power leads supplied with this appliance are UL recognized for connections to larger gauge household wiring. The insulation of these leads is rated at temperatures much higher than the temperature rating of household wiring. The current carrying capacity of a conductor is governed by the wire gauge and also the temperature rating of the insulation around the wire.
Pages mentionnées dans ce manuel — fabricant, assistance et téléchargements.
Les utilisateurs et notre équipe répondent généralement sous 24 h — et votre question servira aussi aux suivants.
Soyez le premier à poser une question — d'autres utilisateurs ou notre équipe y répondront.