Floor Tiling Installation Guide Ancillar y Products A full range of high quality fixing and sealing products, researched and developed to meet Fired Earth standards, are available for both professional and DIY use. Read the instructions on the packaging of Adhesives, Grouts and Sealants very carefully .
Floor Tiling Installation Guide Contents Substrates 4 Planning 6 Fixing 7 Cutting 8 Sealing 9 Grouting 1 0 Terracotta Tiles 1 1 Presealed Terracotta, Geometric, Roman Mosaic and Encaustic Tiles 13 Sla.
5 Substrates If your tiling is to last, it is essential that the surface onto which the tiles are to be laid is sound. Careful consideration must be given to the floor surface to confirm that the surface is level, clean, dry , free of dust, grease and any loose material.
Step 4. When tiling commences you should start at point ‘X’, so check that the lines you have marked make a perfect right angle and the side line runs parallel to the centre line. Grout joints The width of grout joints will vary between 3–12mm. Large joints will be necessary on rustic tiles such as terracotta and slate.
9 8 Cutting Due to the thickness and make-up of the majority of Fired Earth floor tiles, it is recommended that either a diamond cutter or an angle grinder is used to cut the tiles. Water cooled diamond cutters are available from tool hire shops. Please wear suitable protective eyewear and protective clothing when cutting tiles.
Grouting Grouting refers to the process of filling the spaces between the individual tiles and thus completing the floor surface. Before grouting can commence, the adhesive used must have cured, which usually takes between 12–24 hours for Fired Earth Floor Adhesive* and 3 hours for Fired Earth Fastset Adhesive*.
P ammets because salt pits cannot be 'blended in' without the use of wax polish. Maintenance Terracotta floors should be swept or vacuumed regularly to remove all loose dirt.
15 14 Slate and Lubelska Bricks Sealing Before grouting apply one or two coats of Fired Earth Stone Shield* using a clean, fluff-free cloth. Allow approximately 2 hours between applications and do not apply more sealer than can be fully absorbed by the tiles within 20 minutes.
17 P orcelain and Glass Tiles These tiles do not require any sealing or finishing products. After grouting, the tiles should be polished with a soft, clean cloth to remove any remaining grout film. The grout can be sealed with MN Stain Stop* to prevent staining.
Substrate Sand and Cement Screed Concrete/Brickwork Timber Floorboards (sound and secure) Timber Floorboards overlaid with WBP Plywood (min depth 18mm) Timber Floating Floors Quarry , Clay , Glazed Ti.
Substrate Sand and Cement Screed Concrete/Brickwork Timber Floorboards (sound and secure) Timber Floorboards overlaid with WBP Plywood (min depth 18mm) Timber Floating Floors Quarry , Clay , Glazed Ti.
Product Sealant Finish Cleaner Maintenance Terracotta (inc. Reclaimed terracotta) Fired Earth Linseed Sealer* Wax paste (high protection/high maintenance/ colour enhancer) Cotto Rapid (low maintenance.
Un point important après l'achat de l'appareil (ou même avant l'achat) est de lire le manuel d'utilisation. Nous devons le faire pour quelques raisons simples:
Si vous n'avez pas encore acheté AGA Fired Earth c'est un bon moment pour vous familiariser avec les données de base sur le produit. Consulter d'abord les pages initiales du manuel d'utilisation, que vous trouverez ci-dessus. Vous devriez y trouver les données techniques les plus importants du AGA Fired Earth - de cette manière, vous pouvez vérifier si l'équipement répond à vos besoins. Explorant les pages suivantes du manuel d'utilisation AGA Fired Earth, vous apprendrez toutes les caractéristiques du produit et des informations sur son fonctionnement. Les informations sur le AGA Fired Earth va certainement vous aider à prendre une décision concernant l'achat.
Dans une situation où vous avez déjà le AGA Fired Earth, mais vous avez pas encore lu le manuel d'utilisation, vous devez le faire pour les raisons décrites ci-dessus,. Vous saurez alors si vous avez correctement utilisé les fonctions disponibles, et si vous avez commis des erreurs qui peuvent réduire la durée de vie du AGA Fired Earth.
Cependant, l'un des rôles les plus importants pour l'utilisateur joués par les manuels d'utilisateur est d'aider à résoudre les problèmes concernant le AGA Fired Earth. Presque toujours, vous y trouverez Troubleshooting, soit les pannes et les défaillances les plus fréquentes de l'apparei AGA Fired Earth ainsi que les instructions sur la façon de les résoudre. Même si vous ne parvenez pas à résoudre le problème, le manuel d‘utilisation va vous montrer le chemin d'une nouvelle procédure – le contact avec le centre de service à la clientèle ou le service le plus proche.