Manuel d'utilisation / d'entretien du produit VHS-180 du fabricant Slant/Fin
Aller à la page of 27
HO T W A TER MODELS VHS-30 THR OUGH VHS-180 GAS-FIRED CAST -IR ON BOILERS FOR NA TURAL AND L.P . PR OP ANE GASES IMPOR T ANT READ ALL OF THE FOLLO WING W ARNINGS AND ST A TEMENTS BEFORE READING THE INST ALLA TION INSTR UCTIONS W ARNING LIQUEFIED PETROLEUM (L.
V I CTOR Y II V HS Models NO TE: Height dimensions increase by 1 3 ⁄ 4 " and depth increases to 22 1 ⁄ 4 " when combustib le floor kit is used.
V I CTOR Y II V HS Models INST ALLA TION REQUIREMENTS The installation must conf or m to the requirements of the a uthority having jurisdiction or , in the absence of such requirements, to the National Fuel Gas Code , ANSI Z223.
V I CTOR Y II V HS Models BOILER ROOM AIR SUPPL Y AND VENTILA TION An ample supply of air is required f or combustion and v enti- l ation. When buildings are insulated, caulked and w eather- stripped, now or later on, direct openings to outside ma y be required and should be provided.
V I CTOR Y II V HS Models CA TEGOR Y II AND III VENTING 1. V ent Material A) The vent system f or horizontal or vertical venting (Categor y II and III ) must be UL listed single wall 3" diameter AL29-4C s stainless steel material.
V I CTOR Y II V HS Models Heat-Fab Saf-T V ent System Boiler Model No . Minimum Length, Ft. 0 to 5500 Ft. Altitudes 5500 to 7000 Ft. Altitudes 7000 to 10,000 Ft.
V I CTOR Y II V HS Models Figure 6 Figure 5 VICT OR Y II HORIZONT AL (SIDEW ALL) VENTING All joints must be liquid and pressure tight. Use U/L listed single wall 3" dia. AL29-4C* S.S . venting materials * Definition of Snow Line: Knowledge of local conditions will re veal the maximum height that repeated snowf alls accumulate to.
V I CTOR Y II V HS Models 8 Figure 7..
V I CTOR Y II V HS Models Figure 8. 9.
V I CTOR Y II V HS Models 10 CA TEGOR Y I VENTING (Natural Draft Chimney and T ype “B” V enting) 1. Installation Model VHS-90, VHS-120, VHS-150 and VHS-180 may be v ented into a natur al draft mas.
V I CTOR Y II V HS Models T able 1. Masonry Vitreous Tile-Lined Chimney (not metal lined) C himneys not e xposed to the outdoors below the roof line. (5" dia. vent adapter must be used) Natural Draft Chimney and T ype “B” V enting T ables A dditional National Fuel Gas Code Boiler Gas Appliance Reference T able No.
V I CTOR Y II V HS Models 12 Figure 9..
V I CTOR Y II V HS Models Figure 10. 13.
V I CTOR Y II V HS Models 14 VENTING SYSTEM REGULAR INSPECTION A. Inspect the system regularly f or condensation, corrosion and/or ph ysical damage. A qualified prof essional should ser- vice the boiler annually and include such an inspection at that time.
V I CTOR Y II V HS Models Figure 11a. Figure 11b. W A TER PIPING Alwa ys f ollow good piping practices . Obser ve minimum 1" clearance to comb ustibles around all uninsulated hot water pipes or when openings around pipes are not protected by non-combustib le materials.
V I CTOR Y II V HS Models 16.
V I CTOR Y II V HS Models Figure 14. Figure 15. Piping Arrangement 17.
V I CTOR Y II V HS Models 18 An automatic air vent is used to remo ve air from the sys- tem. It should be installed in the top of the boiler as shown i n Figure 15. If system pressure needs fur ther control, add an additional tank in parallel with original tank or install a larger capacity tank.
V I CTOR Y II V HS Models Instructions F ollow the lighting instructions in this manual. These instruc- t ions are also attached to the boiler . SAFETY INFORMA TION F or Y o ur Saf e ty Read Bef o re .
V I CTOR Y II V HS Models The gas metered in 3 minutes to obtain rated input f or e ach boiler model , using 1000 Btu/cu. ft. gas, is tab u- lated in gas rate table . B. Main Bur ners 1. Fire the boiler continuously for at least 15 min utes, to reach burner operating temperature.
V I CTOR Y II V HS Models 1. High Limit Control T est Set thermostat high enough for water temperature to reach high limit control setting of Aquastat. When this temperature is reached, the high limit s witch should open and the main gas valv e should close automatically .
V I CTOR Y II V HS Models 22 3. P erf or m “V enting System Regular Inspection” on P age 14. C . Piping Check the f ollowing: 1. W ater piping and accessories for leaks. Slightest l eaks should be corrected. 2. System to be full of water and pressure to remain stable at correct setting on gauge .
V I CTOR Y II V HS Models THERMOST A T CALLS FOR HEA T CIRCULA TOR ON IGNITION SP ARK ST AR TS AND PILO T V AL VE OPERA TOR OPENS THERMOST A T CALLS FOR HEA T ENDS CIRCULA TOR OFF .
V I CTOR Y II V HS Models BURNERS F AIL T O OPERA TE CA USE REMED Y 1. Gas supply valv e shut off 1. Open gas valve 2. No power , main electr ic s witch open 2. Close switch 3. No power , blown or def ective line fuse 3. Replace fuse 4. Pilot flame too low 4.
V I CTOR Y II V HS Models 25 DELA YED IGNITION CA USE REMED Y 1 . Pilot flame too low 1. Adjust pilot flame 2. Excessiv e primar y air 2. Adjust pr imary air shutter 3. Excessiv e burner input 3. Check and reduce to input shown on rating plate NO T ENOUGH HEA T CA USE REMED Y 1.
V I CTOR Y II V HS Models 26 A PPENDIX A V ent System Location and Condensation Drain Requirements 1 . The v enting system shall ter minate at least 3 feet abov e any forced air inlet located within 10 f eet.
SLANT/FIN CORPORA TION, Green vale, N.Y . 11548 • Phone: (516) 484-2600 F AX: (516) 484-5921 • Canada: Slant/Fin L TD/L TEE , Mississauga, Ontario www .
Un point important après l'achat de l'appareil (ou même avant l'achat) est de lire le manuel d'utilisation. Nous devons le faire pour quelques raisons simples:
Si vous n'avez pas encore acheté Slant/Fin VHS-180 c'est un bon moment pour vous familiariser avec les données de base sur le produit. Consulter d'abord les pages initiales du manuel d'utilisation, que vous trouverez ci-dessus. Vous devriez y trouver les données techniques les plus importants du Slant/Fin VHS-180 - de cette manière, vous pouvez vérifier si l'équipement répond à vos besoins. Explorant les pages suivantes du manuel d'utilisation Slant/Fin VHS-180, vous apprendrez toutes les caractéristiques du produit et des informations sur son fonctionnement. Les informations sur le Slant/Fin VHS-180 va certainement vous aider à prendre une décision concernant l'achat.
Dans une situation où vous avez déjà le Slant/Fin VHS-180, mais vous avez pas encore lu le manuel d'utilisation, vous devez le faire pour les raisons décrites ci-dessus,. Vous saurez alors si vous avez correctement utilisé les fonctions disponibles, et si vous avez commis des erreurs qui peuvent réduire la durée de vie du Slant/Fin VHS-180.
Cependant, l'un des rôles les plus importants pour l'utilisateur joués par les manuels d'utilisateur est d'aider à résoudre les problèmes concernant le Slant/Fin VHS-180. Presque toujours, vous y trouverez Troubleshooting, soit les pannes et les défaillances les plus fréquentes de l'apparei Slant/Fin VHS-180 ainsi que les instructions sur la façon de les résoudre. Même si vous ne parvenez pas à résoudre le problème, le manuel d‘utilisation va vous montrer le chemin d'une nouvelle procédure – le contact avec le centre de service à la clientèle ou le service le plus proche.