Manuel d'utilisation / d'entretien du produit ECT Series du fabricant PB Heat
Aller à la page of 27
EC/ECT Boilers Series Oil Installation, Operation & Maintenance Manual As an ENERGY ST AR ® Partner, PB Heat, LLC has determined that certain firing rates of this product meet the ENERGY ST AR ® guidelines for energy efficiency .
USING THIS MANUAL 1 A . INST ALLA TION CLEARANCE . . . . . . . . . . . . .1 B . SPECIAL A TTENTION BOXES . . . . . . . . . . . .1 1. PREINST ALLA TION 2 A . CLEARANCES . . . . . . . . . . . . . . . . . . . . . . . .2 B . AIR FOR COMBUSTION AND VENTILA TION .
1 A. INST ALLA TION CLEARANCE F ollow the installation instructions provided in this manual in the order shown. The order of these instructions has been set in order to provide the installer with a logical sequence of steps that will minimize potential interferences and maximize safety during boiler installation.
2 A. CLEARANCES Unit may be installed on combustible flooring, provided the boiler is not set on carpet and a metal drip pan is placed under the appliance. Unit may be installed in a closet with the above clearances. See also Section B, Air for Combustion and V entilation.
3 C. CHIMNEY / VENT AND DRAFT CONTROL 1. Draft Requirement – Minimum draft r equired in the vent system is -.03" to -.05" W .C. depending on boiler model, see T able 7.1 (Section 7). This draft is necessary to provide the necessar y draft over fire of -.
4 A. SETTING THE BOILER 1. Provide a level foundation, located as close as possible to the center of the heating system. 2. Refer to Figur e 2.2 for exploded view of boiler while checking and/or assembling parts of the boiler . 3. See clearance information in Section 1, "Pr einstallation.
5 BOILER PLA CEMENT AND ASSEMBL Y Figure 2.2: Boiler Exploded View (See T able 8.1 in Section 8 for parts identification)..
6 A. PRESSURE TEST BLOCK ASSEMBL Y 1. Make up cold water supply connection to the boiler . 2. Install pressur e gauge or pressure-temperatur e gauge in tapping provided. See Boiler Dimensional drawing, Figur e 7.1 (Section 7). 3. Plug all open tappings in the boiler and fill with water .
7 D . WA TER BOILER PIPING 1. Refer to the W ater Installation Sur vey and Hydronics Institute Residential Hydronic Heating Installation/Design Guide for Guidance. 2. The supply and return connections should be sized to suit the system. 3. Pipe the supply and r etur n in one of two ways as shown in Figur e 3.
8 E. T ANKLESS HEA TER OR COVERPLA TE 1. If a tankless coil is used (item 13 or 17), install as pictured. On water boilers, install in opening in front section. On steam boilers, install in opening in rear section. F or suggested piping of tankless water heaters refer to F igures 3.
9 F . CONTROLS 1. W ater Boiler Controls: Install the limit / operating control, pressur e- temperature gauge and safety r elief valve. See Figure 7.1 (Section 7) for proper location. F or installations subject to UL726, a second operating control that senses water temperature is also r equired (not provided).
10 A. GENERAL All electrical wiring shall be done in accordance with the National Electrical Code and Local Requirements. Single pole switches including those of safety controls or protective devices shall not be wired in a grounded line. B. BURNER WIRING 1.
11 Figure 4.3: Steam Boiler with Probe Low W ater Cut - Off Figure 4.2: Steam Boiler with Float Low Water Cut - Off ELECTRICAL.
12 ELECTRICAL Figure 4.5: Zoning with Circulators Figure 4.4: Water Boilers.
13 ELECTRICAL Figure 4.6: Zoning with Zone V alves Figure 4.7: Partner with Circulator.
14 BURNER SETUP & BOILER OPERA TION A. BURNER INST ALLA TION 1. The oil burner is supplied with a mounting flange fixed in position. 2. Mount the burner to the Bur ner Mounting Plate (item 3) with four (4) 5/16" studs and nuts provided.
15 BURNER SETUP & BOILER OPERA TION E. CLEAN THE BOILER (STEAM BOILERS ONL Y) 1. Clean the boiler within one week after initial start-up. Cleaning will be more effective if boiler operates a day or two to loosen sediment and impurities in system. 2.
16 BURNER SETUP & BOILER OPERA TION C ARLIN BURNER SPECIFIC A TIONS Boiler Model No . Firing Rate Burner Model No . Air Shutter Nozzle Size Pum p Pressure Start-up Settings Air Band Head Bar EC/ECT -03-075 .75 EZ-1HP Blank 0.60 70° B DEL³ 150 psig 0.
17 MAINTENANCE 6. MAINTENANCE W ARNING Product Saf ety Inf ormation Refractory Ceramic Fiber Product This appliance contains materials made from refractory ceramic fiber s (RCF). Airborne RCF , when inhaled, have been classified b y the International Ag ency f or Research on Cancer (IARC), as a possible carcinogen to humans.
18 MAINTENANCE A. GENERAL 1. Check pipes adjacent to cold walls or in unheated spaces. Insulate and tape them if necessary to be sure they can't fr eeze up.
19 MAINTENANCE 3. Remove any scale or soot from the combustion chamber area by vacuum cleaning or any other available means. 4. Replace flue collector and close burner mounting plate, making sure all gaskets ar e in place. 5. Replace jacket top panel.
20 BOILER DIMENSIONS & RA TINGS 7. BOILER DIMENSIONS & RA TINGS T APPING L OC A TIONS Location Size NPT W ater Steam H 3/4" N/A Low Limit Control I 3/4" Limit Control Pr essure Gauge.
21 BOILER DIMENSIONS & RA TINGS T able 7.1: Boiler Ratings ✸ As an ENERG Y ST AR ® Partner , PB Heat has determined that these firing rates meet the ENERGY ST AR guidelines for energy efficiency . ✝ All chimneys are 8" x 8" x 20' e xcept those models denoted with ( ✝ ), which are 8" x 12" x 20'.
22 R E PA I R PA R T S 8. REP AIR P ARTS Repair par ts are available from your installer or by contacting PB Heat, LLC, 131 S. Church, Bally , P A 19503. Note: Remember to include boiler model number and serial number when ordering par ts. T able 8.1 Item No .
23 NOTES.
24 NOTES.
EC/ECT Boilers Series Oil Installation, Operation & Maintenance Manual TO THE INST ALLER: This manual is the property of the owner and must be affixed near the boiler for future reference. TO THE OWNER: This boiler should be inspected annually by a Qualified Service Agency.
Un point important après l'achat de l'appareil (ou même avant l'achat) est de lire le manuel d'utilisation. Nous devons le faire pour quelques raisons simples:
Si vous n'avez pas encore acheté PB Heat ECT Series c'est un bon moment pour vous familiariser avec les données de base sur le produit. Consulter d'abord les pages initiales du manuel d'utilisation, que vous trouverez ci-dessus. Vous devriez y trouver les données techniques les plus importants du PB Heat ECT Series - de cette manière, vous pouvez vérifier si l'équipement répond à vos besoins. Explorant les pages suivantes du manuel d'utilisation PB Heat ECT Series, vous apprendrez toutes les caractéristiques du produit et des informations sur son fonctionnement. Les informations sur le PB Heat ECT Series va certainement vous aider à prendre une décision concernant l'achat.
Dans une situation où vous avez déjà le PB Heat ECT Series, mais vous avez pas encore lu le manuel d'utilisation, vous devez le faire pour les raisons décrites ci-dessus,. Vous saurez alors si vous avez correctement utilisé les fonctions disponibles, et si vous avez commis des erreurs qui peuvent réduire la durée de vie du PB Heat ECT Series.
Cependant, l'un des rôles les plus importants pour l'utilisateur joués par les manuels d'utilisateur est d'aider à résoudre les problèmes concernant le PB Heat ECT Series. Presque toujours, vous y trouverez Troubleshooting, soit les pannes et les défaillances les plus fréquentes de l'apparei PB Heat ECT Series ainsi que les instructions sur la façon de les résoudre. Même si vous ne parvenez pas à résoudre le problème, le manuel d‘utilisation va vous montrer le chemin d'une nouvelle procédure – le contact avec le centre de service à la clientèle ou le service le plus proche.