Manuel d'utilisation / d'entretien du produit PDFY-P12NMU-E du fabricant Mitsubishi Electronics
Aller à la page of 25
TECHNICAL & SER VICE MANU AL <Indoor unit> PDFY-P06NMU-E,PDFY-P08NMU-E PDFY-P12NMU-E,PDFY-P15NMU-E PDFY-P18NMU-E,PDFY-P24NMU-E PDFY-P27NMU-E,PDFY-P30NMU-E PDFY-P36NMU-E,PDFY-P48NMU-E 2005 Models Ceiling Concealed Built-in Ser ies PDFY CONTENTS SAFETY PRECA UTIONS ························· 1.
1 - Inadequate connection and fastening ma y generate heat and cause a fire. • Prepare for typhoons and other str ong winds and ear thquakes and install the unit at the specified place. - Improper installation may cause the unit to topple and result in injury .
2 2 . Precautions for de vices that use Caution: • Do not use the existing refrigerant piping. - The old refr igerant and refrigerator oil in the e xisting piping con- tains a large amount of chlor ine which ma y cause the refrigerator oil of the new unit to deteriorate .
3 PDFY-P06NMU-E PDFY-P08NMU-E PDFY-P12NMU-E PDFY-P15NMU-E PDFY-P18NMU-E PDFY-P24NMU-E PDFY-P27NMU-E PDFY-P30NMU-E PDFY-P36NMU-E PDFY-P48NMU-E 1.8 / 2.0 2.
4 ● ● ● Remote Indoor (Main) Unit controller ● Operation buttons [P AR-21MAA] Once the controls are set, the same operation mode can be repeated by simply pressing the ON/OFF b utton.
5 [Display] C C ON/OFF CENTRALL Y CONTROLLED ERROR CODE CLOCK ON OFF CHECK CHECK MODE FIL TER TEST RUN FUNCTION 1Hr . NOT A V AILABLE ST AND BY DEFROST TEMP .
6 3-1. Specification PDFY-P-NMU-E PDFY-P-NMU-E Notes: *1 Cooling/Heating capacity indicates the maxim um value at operation under the f ollowing condition. Cooling: Indoor: 26.7 ˚ C [80 ˚ F] DB/19.4 ˚ C [67 ˚ F] WB Outdoor: 35 ˚ C [95 ˚ F] DB Heating: Indoor: 21.
7 LEV C1 3.0 µ F X 440V 5.0 µ F X 440V 5.0 µ F X 440V 8.0 µ F X 440V 6.0 µ F X 440V MF1 PDFY- P06,08,12 NMU-E PDFY- P30 NMU-E PDFY- P36 NMU-E PDFY- P48 NMU-E PDFY- P24,27 NMU-E PDFY- P15,18 NMU-E 3-2. Electrical parts specifications Model Pa r t s name T ranrsformer T (Primary) 240V 60Hz (Secondary) (23.
8 123 mm(in.) mm(in.) F 10 E 65 When installing the drain water lifting-up mech(option). (option) 1 3 Suspension bolt hole 2 1 Fresh air intake ø 150(5-29/32)knock out hole 4- ø 3(1/8) Mounting hole Water filling port Control box ø 172 Drain hose Liquid pipe <flare> Gas pipe <flare> 2 1 1 :R410A outdoor unit 2 :R22 outdoor unit 2.
9 PDFY-P36 · 48NMU-E 12(1/2) 1:R410A outdoor unit 2:R22 outdoor unit mm(in.) mm(in.) 30(1-3/16) 52 (2-1/16) 300X4=1200(11-3/16X4=47-1/4) 5- ø 3(1/8)hole 65X20=1300(2-9/16X20=51-3/16) 21X2- ø 3(1/8)hole 35(1-13/32) 1440(56-23/32) 35(1-13/32) 105 65 (2-9/16) 214 33 3 When installing the drain water lifting-up mech(option).
10 WIRING DIA GRAM 5 CN2M ( ) ( ) CN3T NOTE 1 NOTE 1 S(SHIELD) G PARTS LOCATION AC250V 5A F (Green) (Red) (White) (Yellow) (Green) (Yellow) (Green) (Yellow) (White) (White) (White) (Blue) (White) (Blu.
11 PDFY-P36 · 48NMU-E PARTS LOCATION Varistor ZNR1,ZNR901 G 543 2 1 (Green) CN22 (Yellow) CN24 (White) CN25 NOTE1 (Blue) (Red) (White) DP T1 T2 T3 AC250V 5A F ( ) ( ) AC250V 6.3A T S(SHIELD) TB15 (TRANSMISSION TERMINAL BED) TB5 (TRANSMISSION TERMINAL BED) TB2 F2 L2 L1 ZNR901 901 CN2M (Blue) C 1 2 4 2 1 4 2 1 MF CND(Red) 5 3 1 X07 I.
12 Strainer (#100mesh) Strainer (#100mesh) Heat exchanger Room temparature thermistor TH21 Gas pipe thermistor TH23 Liquid pipe thermistor TH22 Linear expansion v alve Gas pipe Flare connection Gas pipe PDFY -P06,08,12,15NMU-E PDFY -P18NMU-E Capacity Item ø 12.
13 Room temparature thermistor (TH21) Liquid pipe thermistor (TH22) Gas pipe thermistor (TH23) T ransformer F an motor Linear e xpansion v alve Disconnect the connector , then measure the resistance using a tester . (Sorrounding temperature 10 ˚ C~30 ˚ C[50 ˚ F~86 ˚ F]) Disconnect the connector and measure the resistance using a tester .
14 0 10 20 30 40 50 -20 -10 0 10 20 30 40 50 < Ther mistor f or lower temperature > T emperature ( ˚ C) -4 14 32 50 68 86 104 122 [ ˚ F] Resistance (k Ω ) 4 ø 4 3 6 5 ø 3 2 ø 2 1 ø 1 ø .
15 Output (Phase) Output ø 1 1 ON ø 2 ON ø 3 OFF ø 4 OFF 2 OFF ON ON OFF 3 OFF OFF ON ON 4 ON OFF OFF ON <Output pulse signal and the valve operation> ➁ Linear e xpansion valve oper ation .
16 1 2 3 4 5 6 7 8 9 10 1~6 1~10 1~4 Thermistor<Intake temperature detection>position ON OFF Filter crogging detection Provided Not provided Filter lif e 2,500hr 100hr Air intake Eff ective Not .
17 0 5 9 4 8 3 7 2 6 1 SW12 10 0 5 9 4 8 3 7 2 6 1 SW1 1 1 0 8 F 7 E 6 D 5 C 4 B 3 A 2 9 1 SW14 3 2 1 0 5 9 4 8 3 7 2 6 1 SW12 0 5 9 4 8 3 7 2 6 1 SW1 1 0 8 F 7 E 6 D 5 C 4 B 3 A 2 9 1 SW14 Address bo.
18 (A) Fig.1 OPERA TING PROCEDURE PHO T OS DISASSEMBL Y PR OCEDURE 8 8-1 CONTROL BO X Be careful removing hea vy par ts. 1.Removing the contr ol box co ver (1)Remov e the fixing screws(two) of the cov er(A) and remov e the cover . (C) (D),(E) Fig.1 Fig.
19 (F),(G) Fig.1 8-3 THERMIST OR (Intake air temperature detection) OPERA TING PROCEDURE PHO T OS 1.Removing the thermistor and thermistor holder (1)Pull out the thermistor holder(F) and ther mistor (G) which are fix ed the control box. (H) 1 2 Fig.1 Fig.
20 (J) Fig.1 Fig.2 (K),(L) OPERA TING PROCEDURE PHO T OS 8-5 THERMIST OR (Gus piping temperature detection) 1.Removing the co ver (1)Remov e the fixing screw of the cov er(J) and remov e the cover . 2.Removing the thermistor (1)Remov e the ther mistor(K), from the ther mistor holder(L), which are installed on the copper tube.
21 (M) (N) (R) fan motor shaft fixing screw Fig.1 Fig.2 Fig.3 1 2 2 3 3 (P) (Q) OPERA TING PROCEDURE PHO T OS 8-6 F AN and F AN MO T OR 1.Removing the filter (1)Press the tabs of the filter and remov e the filter in the direction of the arrow 1 .
22 Fig.1 Fig.2 (S) OPERA TING PROCEDURE PHO T OS 8-7 HEA T EXCHANGER 1.Removing the drainpan with pr ocedure 8-4 2.Removing the co ver(J) with procedure 8-5 3.Removing the Heat e xchanger (1)Remov e the fixing screws of the heat e xchang- er(S) and remov e the heat exchanger .
Issued in Aug. 2005 HWE05160 New publication, effective Aug. 2005 Specifications subject to change without notice.
3400 Lawrenceville Suwanee Road ● Suwanee, Georgia 30024 Toll Free: 800-433-4822 ● Toll Free Fax: 800-889-9904 www.mrslim.com Specifications are subject to ch ange without notice.
Un point important après l'achat de l'appareil (ou même avant l'achat) est de lire le manuel d'utilisation. Nous devons le faire pour quelques raisons simples:
Si vous n'avez pas encore acheté Mitsubishi Electronics PDFY-P12NMU-E c'est un bon moment pour vous familiariser avec les données de base sur le produit. Consulter d'abord les pages initiales du manuel d'utilisation, que vous trouverez ci-dessus. Vous devriez y trouver les données techniques les plus importants du Mitsubishi Electronics PDFY-P12NMU-E - de cette manière, vous pouvez vérifier si l'équipement répond à vos besoins. Explorant les pages suivantes du manuel d'utilisation Mitsubishi Electronics PDFY-P12NMU-E, vous apprendrez toutes les caractéristiques du produit et des informations sur son fonctionnement. Les informations sur le Mitsubishi Electronics PDFY-P12NMU-E va certainement vous aider à prendre une décision concernant l'achat.
Dans une situation où vous avez déjà le Mitsubishi Electronics PDFY-P12NMU-E, mais vous avez pas encore lu le manuel d'utilisation, vous devez le faire pour les raisons décrites ci-dessus,. Vous saurez alors si vous avez correctement utilisé les fonctions disponibles, et si vous avez commis des erreurs qui peuvent réduire la durée de vie du Mitsubishi Electronics PDFY-P12NMU-E.
Cependant, l'un des rôles les plus importants pour l'utilisateur joués par les manuels d'utilisateur est d'aider à résoudre les problèmes concernant le Mitsubishi Electronics PDFY-P12NMU-E. Presque toujours, vous y trouverez Troubleshooting, soit les pannes et les défaillances les plus fréquentes de l'apparei Mitsubishi Electronics PDFY-P12NMU-E ainsi que les instructions sur la façon de les résoudre. Même si vous ne parvenez pas à résoudre le problème, le manuel d‘utilisation va vous montrer le chemin d'une nouvelle procédure – le contact avec le centre de service à la clientèle ou le service le plus proche.