INST ALLATION INSTRUCTIONS 62-0304-05 Class 500 Advanced KWh/Demand Meter APPLICATION The Class 500 Meter is a 3-element meter with commu nications. The device is used to moni tor electric power usage of ind ividual loads after the utility meter .
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 2 S PECIFICATIONS Input V oltage Configuration: 3-wire (Delta) or 4-wire (WYE) Mains V oltage Input: Up to 600 V AC RMS available Input Power: 6 V A maximum rating Current Sensor Rating: Up to 3200 Amp RMS AC available Power Factor: .
CLASS 500 ADVANCED KWH/DEMAND METER 3 62-0304—05 INST ALLATION VERIFY the input voltage rating and configu ration on the unit panel label to ensure it is suitable for the intended e lectrical servic e. Meters labeled for 1 15/208 volt service MUST NOT be installed on service feeds of 277/4 80 volt and vice versa.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 4 Main Power Board Connections to this board include the MA INS input voltage, current sensors, an d external pulse input (See Fig. 2). The MAINS input terminals are covered with a protective clear sh ield fo r safety purposes.
CLASS 500 ADVANCED KWH/DEMAND METER 5 62-0304—05 d. Connect the three AC mains power wires (PHASE A, PHASE B, and PHASE C) to their respective po sitions as labeled on terminal block TB1.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 6 Fig. 3. Split core current sensor assembly . Fig. 4. Split core current sensor assembl y installed. IMPORT ANT : When looking from the source side of the conductor(s) bein g monitored, you should see the arrow on the current sensor assembly .
CLASS 500 ADVANCED KWH/DEMAND METER 7 62-0304—05 Fig. 7. Location of LED D5 (lab eled “MTR”) and Ethernet board. V erify that the AC MAINS vol tage wires ar e all connected to the correct posi tions on terminal block TB1. Inspect the MAINS inp u t wiring to verify each conductor is terminated at the correct te rminal block positi on.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 8 Wiring to the Network RS-485 Wiring for BACnet MS/T P , Modbus RTU, or EZ-7 The Class 500 Meter contains an RS-485 serial communications port allowing it to commu nicate via BACnet MS/TP , Modbus RTU, or EZ-7.
CLASS 500 ADVANCED KWH/DEMAND METER 9 62-0304—05 The meter is shipped with a Modb us ID number of 01. This must be changed if the network has more than one meter installed.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 10 Fig. 1 1. LON wiring . Ethernet wiring for BACnet IP , an d Modbus TCP/IP and Ethernet EZ-7 These models are shipped with a board that a llows for Ethernet commun ication via Modb us TCP/IP , BACnet IP or Ethernet EZ-7.
CLASS 500 ADVANCED KWH/DEMAND METER 11 62-0304—05 NOTE: One set of current sensors equates to th ree sensors, one per phase. The multiplier only appli es when extra sets of cur- rent sensors are installed on one Class 50 0 Meter . Therefore, if you are using on ly one set of three current sensors, the multiplier is not required.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 12 MAINTENANCE The Class 500 Meter unit is shi pped in a calibrated an d fully fu nctionally tested condi tion. Sinc e the u nit is factory calibrat ed using proprietary firmware algorithms, no internal uni t adjustments ar e nece ssary .
CLASS 500 ADVANCED KWH/DEMAND METER 13 62-0304—05 Use the following procedure to re place the lithium battery cell. 1. Disconnect power from the Class 500 Meter at the unit external circuit breaker . 2. Remove the battery from its socket and place it on a non-conductive surface.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 14 Modbus Point Map Modbus data points available from the Class 5 00 meter . Listed under Class 500. T able 4.
CLASS 500 ADVANCED KWH/DEMAND METER 15 62-0304—05 NOTE: T o change device ID, set single point at 46049 with data set to new device ID (e.g., 1 to 247). T o set date/time, set multiple points at 46025 for 4 points with data set to HHMM SSDW MMDD YYYY (DW=day of week).
CLASS 500 ADVANCED KWH/DEMAND METER Automation and Co ntrol Solutions Honeywell Internationa l Inc. 1985 Douglas Drive North Golden Valley, MN 55422 customer.honeywell.com ® U.S. Regi stered T rademark © 201 1 Ho neywell International Inc. 62-0304—05 M .
Un point important après l'achat de l'appareil (ou même avant l'achat) est de lire le manuel d'utilisation. Nous devons le faire pour quelques raisons simples:
Si vous n'avez pas encore acheté Honeywell 500 c'est un bon moment pour vous familiariser avec les données de base sur le produit. Consulter d'abord les pages initiales du manuel d'utilisation, que vous trouverez ci-dessus. Vous devriez y trouver les données techniques les plus importants du Honeywell 500 - de cette manière, vous pouvez vérifier si l'équipement répond à vos besoins. Explorant les pages suivantes du manuel d'utilisation Honeywell 500, vous apprendrez toutes les caractéristiques du produit et des informations sur son fonctionnement. Les informations sur le Honeywell 500 va certainement vous aider à prendre une décision concernant l'achat.
Dans une situation où vous avez déjà le Honeywell 500, mais vous avez pas encore lu le manuel d'utilisation, vous devez le faire pour les raisons décrites ci-dessus,. Vous saurez alors si vous avez correctement utilisé les fonctions disponibles, et si vous avez commis des erreurs qui peuvent réduire la durée de vie du Honeywell 500.
Cependant, l'un des rôles les plus importants pour l'utilisateur joués par les manuels d'utilisateur est d'aider à résoudre les problèmes concernant le Honeywell 500. Presque toujours, vous y trouverez Troubleshooting, soit les pannes et les défaillances les plus fréquentes de l'apparei Honeywell 500 ainsi que les instructions sur la façon de les résoudre. Même si vous ne parvenez pas à résoudre le problème, le manuel d‘utilisation va vous montrer le chemin d'une nouvelle procédure – le contact avec le centre de service à la clientèle ou le service le plus proche.